GB
7
Towel dryer
Preparation
– Before starting installation, please check that all
parts are present, and make sure that you are
COMPLETELY satisfied with the size and design
of the radiator.
– Contact the supplier immediately, if there are
damaged or missing parts.
– The radiator must be installed using the plumbing
fixtures included in the scope of delivery.
– The included plumbing fixtures enable installation
on solid walls. In the case of a hollow wall (e.g.
drywall), the radiator should be attached to the
wooden beams where possible, or other suitable
plumbing fixtures should be used.
– When drilling into walls, floors or ceilings, it is
important to check beforehand whether there are
lines or cables present.
– The plastic caps on the threaded connections of
the radiator must be removed and disposed of
prior to installation.
– Make sure that the radiator is positioned so that it
can be easily connected to the central heating
system.
Care and maintenance
– Wipe the surface using a soft, damp cloth. Never
use solvents, scouring pads, abrasive cleaning
agents, bleach, acids, harsh detergents, aggres-
sive chemical cleaners, or solvent-based cleaning
agents on this product.
Note:
IMPORTANT – Please read the sepa-
rate safety instructions before use.
Note:
*) Refers to water and dual fuel ver-
sion