1 of 6
1.
INSPECTION
Inspect the cartons and various components for evidence of rough handling and concealed damage. Damage
claims should be filed with the carrier.
2.
MAINTENANCE (Fountains with Cooling Unit)
The only maintenance required is the removal of dirt and lint from the condenser. Inspection should be made at 3
mount intervals. Remove the grille and clean the condenser with a vacuum attachment.
3.
OVERLOAD PROTECTION (Fountains with Cooling Unit)
The compressor motor is equipped with an automatic reset protector which will disconnect the compressor motor
from the power source in case of overload.
4.
LUBRICATION (Fountains with Cooling Unit)
This unit is equipped with a sealed fan motor and hermetically sealed compressor. No additional lubrication is
required.
5.
TO DISCONTINUE USE OF FOUNTAINS WITH COOLING UNITS
Drain cooler when removed from service: (1) Remove grille, (2) Close supply valve, (3) Provide container to catch
water, and remove drain plug, (4) Remove bubbler.
6.
IMPORTANT REQUIREMENTS
EBQ Models. CAUTION: DO NOT ACTIVATE BOTTLE FILLER ELECTRIC EYE SENSOR WITHOUT
RUNNING WATER THROUGH THE UVC MODULE. OPERATING THE UVC MODULE DRY WILL
DAMAGE THE UV-C LEDS. See additional instructions below.
7.
INSTALLATION, PLUMBING & ELECTRICAL CONNECTIONS
a) Note: The following states require a licensed plumber to install cooler; AR, GA, MA, MI, OK, RI, SC, SD,
TX, VT and WI. CA, KS, MN, NM and OR allow for a state-registered installer or contractor as well. State
and local plumbing codes may prohibit the use of saddle tapping valves for water line connection in some
applications. All connections must conform to applicable plumbing codes.
b) Plumbing rough-in and wall opening should be prepared as shown on Roughing-in drawing. This drinking
water cooler is designed to be operated at a water supply line pressure of up to 100 psi (690 kPa). A pressure
regulator must be installed in front of the unit’s water inlet if the water pressure (including any possible
pressure spikes) could exceed 100 psi (690 kPa).
c)
Insert frame assembly into wall opening and secure to studs. NOTE: FRONT FLANGE OF FRAME(S)
MUST BE FLUSH WITH THE FINISHED WALL SURFACE.
d) Models with cooling unit, attach cradle mounting angles to unit mounting cradle with 4 screws provided.
Slide unit mounting cradle into frame and secure in place with 4 screws, provided. (Cradle is used only when
cooling unit is to be installed.) NOTE: BOTTOM FLANGE ON CRADLE IS TO BE BEHIND FRAME
FRONT FLANGE.
e)
Slide cooling unit onto cradle.
f)
It is recommended that flexible conduit be used to supply power to cooling unit (and to electrical box in
fountain arm for sensor and solenoid valve on models with electric eye and when applicable to electronic
bottle filler electrical box in frame). Check electric current available. Type and voltage must be the same as
listed on unit data plate. This drinking water cooler is intended to be connected to a 20A minimum ground
fault circuit interrupting (GFCI) device to meet UL requirements.
g)
Install provided waste tee to bottle filler tailpiece.
h) Install the fountain mounting plate to the frame assembly using provided screws.
i)
Prior installing upper panel assembly with electronic bottle filler:
1)
To ease access to the remote toggle button for programming once the panel assembly and fountain is
installed, feed the remote toggle button through the fountain mounting plate noted in step h. After unit is
completely assembled, refer to the “Set-Up Guide for Oasis® Hands-Free Bottle Filler Electronics” to
change program settings.
2)
Attach the long green ground wire to the electrical box and plug in cord for sensor operation.
OASIS
®
AQUA POINTE
®
DRINKING FOUNTAIN
WITH BOTTLE FILLER INSTRUCTIONS