26
3 Phase
Startup Procedures
Make sure the disconnect is off and confirm there is no power on the distribution block on the
electrical panel.
Pull Compressor fuses.
Trip the blower/fan motor starter.
Turn power on. Check and make sure the power at the distribution block is the same as the
power requirements on the data sticker that is on the electrical panel.
Put an amp meter on one of the legs for the blower/fan motor. Confirm the amperage is in line
with the data sticker.
Reset the manual motor starter for the blower/fan.
Make sure the blower/fan is going in the correct direction.
(Should be blowing air at you when
you're standing in front of it)
If it is going the wrong direction, then you need to switch the phases. You will need to switch
the phases that you supplied to the distribution block. The rotation on the blower/fan is rotating
the same direction as the compressor, that was set at the factor. So, if the blower/fan is
operating in the correct direction then your compressor is as well. Make sure to turn the power
off before switching the phase. Confirm there is no power with an electrical meter then make
the switch. Turn the blower/fan motor start off and then turn the power back on. Check for
power and then turn the blower/fan motor starter back on and record the amperage. Confirm
the rotation is correct.
The factory temp setting is 125°F. If you would like to change the temperature, then now is the
time.
(It can be done later as well).
Turn power off.
Double check to make sure all the air is out of the water line so the heat pump doesn't get air
bound.
Pump Test – With the compressor fuses pulled and the blower/fan motor starter in the off,
(tripped), position. Turn the power back on. See figure #1 below. Press the orange by-pass
button on the pump relay to operate the water pump. You should be able to hear the water
flowing through the system. If not, there is a good chance the system is air bound and the air
needs to be removed before starting the compressor. Turn power back off after test.
Figure #1
Commissioning Complete:
Signature: ___________________________