background image

Installation Details

Quick Install Guide - 

CLEER24-10G

The CLEER24-10G Layer 3 managed switch delivers Fast Ethernet and PoE++ (50 
watts per port) over Coax cable with 18 times* the reach of traditional switches. 

CLEER was designed to make the migration to IP quick, easy and cost effective by 

leveraging an existing Coax infrastructure.

*Using RG6 cable

Status LEDs

Removable

Power Supply

Management (MGMT)

& Console Port

24 BNC Female Connectors

24 Downlink Status LEDs

Reset

2 SFP+ Ports

1 x CLEER24-10G Unit

1 x Rackmount Bracket Kit

1 x Console Cable

1 x Power Cable

1 x Quick Install Guide

CLEER24-10G Package Includes:

System Grounding (Earthing): 

See Page 6

Location and Regional Specifications: 

Space Requirements:

1. Select a standard 19" equipment rack or, for a standalone installation, a flat, stable surface capable of supporting the size and weight of the CLEER24-10G, its 

installable components and cabling. 

2. Ensure that you have enough rack space for all equipment. Shelves and rear supporting brackets are not mandatory.

Location Requirements: 

Power - The CLEER24-10G switch must be placed within 6 feet of an available power source. Do not use an extension cord to connect the equipment to a power outlet.
Ventilation - To ensure proper ventilation of the CLEER24-10G, leave at least 2 inches of unobstructed space on all sides of the unit. If the fans are blocked, the unit 

could overheat. 

Downlink – The adapters should be installed a minimum of 6 feet away from the CLEER24-10G switch.

Installation procedures will be trouble

free if you ensure that the following items are available before you begin:

• The CLEER24-10G switch, all cables and accessories you received in the CLEER package.
• SFP/SFP+ transceiver modules for the 10G uplink ports (user-supplied).
• Fiber or UTP cable (user-supplied) for the SFP/SFP+ modules.
• Coax cable for the downlink ports (user-supplied).
• Serial console cable for the CONSOLE port, provided as an accessory in the product package.
• Standard CAT5e copper LAN cable for the MGMT port (optional).  Only needed if out-of-band management is required (user

supplied).

• Protective ground cable (user

supplied).

The CLEER24-10G can be installed in any indoor location in all countries except 

Finland, Norway and Sweden, where, in these 3 Nordic countries, it must be installed 
in a restricted access location. 

CLEER24-10G kan installeras på valfri plats inomhus i samtliga länder utom Finland, 

Norge och Sverige; i dessa nordiska länder måste den installeras på en plats med 
begränsad åtkomst. 

CLEER24-10G kan installeres overalt indendørs undtagen i Finland, Norge og Sverige, 

hvor i disse tre nordiske lande den skal installeres på et sted med begrænset adgang. 

CLEER24-10G kan installeres innendørs i alle land unntatt Finland, Norge og Sverge. I 

disse tre nordiske landene må den installeres på et sted med begrenset tilgang.

Hardware Topology & Installation Overview

1. Remove the CLEER24-10G switch and all accompanying accessories.

2. Install the rackmount brackets for rack mounting.  Unit fits in standard 19” 

racks.

3. Install the protective grounding conductor (please refer to the System 

Grounding section of this guide).

4. Remove all legacy devices from the cabling. 

Note: It is extremely important that 

non-IP devices are not connected when you power on the CLEER24-10G.

5. Connect the infrastructure cable to the BNC connectors on the CLEER24-10G 

switch. 

6.  Connect an uplink port to the network switch. 
7.  For power share, daisy chain CLEER24-10G switches using DC cables (see below).  
8.  Power up the CLEER24-10G.
9.  For troubleshooting, please refer to the Hardware Installation Guide located at 

www.nvtphybridge.com.

10. To revert back to factory defaults, hold the reset button for 50 seconds or until    

the fault (!) LED on the power supply stops flashing red.  Alternatively, factory reset 

can be observed by connecting the console cable; command line of switch will 

confirm that factory reset has occurred during the boot process.

Copyright 2021 NVT Phybridge  |  445-0031 REV. B  |  Page 1

888.901.3633  |  +44 (0) 208 977 6614 |  www.nvtphybridge.com

PoE+ over Coax up to 3,000ft (915m) paired with EC4

PoE+ over Coax up to 4,000ft (1,220m) paired with EC-Link

PoE+ over Coax up to 6,000ft (1,830m) paired with EC-Link+

EC4

IP Endpoint
IP Endpoint
IP Endpoint
IP Endpoint

Local Power

Option

To Application

CLEER24-10G

The Most Robust PoE Capabilities on the Market

Four switches can be stacked together for power sharing and power 

redundancy. The CLEER24-10G switch comes standard with PowerWISE 

technology.

EC-Link

IP Endpoint

Local Power

Option

EC-Link+

Local Power

Option

IP Endpoint

EC-Link

+

Long Reach PoE over Coax

Содержание CLEER24-10G

Страница 1: ...pt Finland Norway and Sweden where in these 3 Nordic countries it must be installed in a restricted access location CLEER24 10G kan installeras på valfri plats inomhus i samtliga länder utom Finland Norge och Sverige i dessa nordiska länder måste den installeras på en plats med begränsad åtkomst CLEER24 10G kan installeres overalt indendørs undtagen i Finland Norge og Sverige hvor i disse tre nord...

Страница 2: ...used To use DHCP enable the DHCP toggle 4 Type in the new IP address of the default gateway into the Default gateway field 5 Click the Apply button next to any fields which were modified 6 Refer to the Administration Guide for more software details Connecting to CLEER24 10G 1 Change the IP address of your PC or Laptop to 192 168 1 2 2 Connect your Ethernet port on the PC or Laptop to the MGMT port on...

Страница 3: ...mpérage ATTENTION La cosse de terre est une borne de terre principale qui doit être connectée en permanence à la terre El servicio de antenimiento y reparación de esta unitad solo puede ser realizado por técnicos autorizados por el fabricante Esta unidad puede tener más de una entrada de energía Para reducir el riesgo de peligro de descargas eléctricas o descargas eléctricas desconecte todas las e...

Страница 4: ...taande ruimte rondom alle kanten van het apparaat worden aangebracht De stekker moet dichtbij de uitrusting worden geïnstalleerd en zijn gemakkelijk bereikbaar Om het risico op schokken of brandgevaar te voorkomen vervang de zekering met hetzelfde type en de waarde VOORZICHTIG De grondvliegtuig is een hoofdterminal die permanent op aarde moet worden aangesloten Tilgang til det indre av denne enhet...

Страница 5: ...ns fyrir þjónustu Til að tryggja fullnægjandi kælingu búnaðarins verður að vera með 2 tommu óhindrað pláss fyrir alla hliðum tækisins Rafmagnstengi skal komið fyrir nálægt búnaði og skal vera aðgengilegur Til að koma í veg fyrir hættu á losti eða eldhættu skal skipta um öryggi með sömu tegund og einkunn VARÚÐ Jörðin er aðal jarðstöðvar sem verður að vera varanlega tengdur við jörðina Aċċess għall ...

Страница 6: ...3 x 11 22 HxWxD 4 39cm x 43 51cm x 28 49cm HxWxD Weight 8 lb 3 63 kg Mounting Standalone rack or shelf mountable 2 brackets included for installation Processor MIPS32 24KEc 500MHz Interface Ethernet Uplink Maximum 2 uplinks each 10Gb s full duplex 2 SFP ports 1000 Base T TX SX LX EX ZX 10GBase T CU SR LR ER ZR determined by SFP or SFP transceiver module installed Ethernet IEEE 802 3z fiber optic ca...

Отзывы: