
18.
Install the main coupler over the strands.Do
not force the main coupler on as it should slide
on smoothly.
Cut and remove both zip ties
.
19.
Thread main coupler into the the
compression coupler. Tighten both couplers
together with the shifting spanner/wrench (3).
20.
Starting immediately at the end of the
compression coupler, wrap the remaining semi-
conductive tape (18) around and over the
copper tape, covering it completely, then
extending an additional 40 mm (1 1/2 in) over
the triple layer insulation with an overlap on
each turn.
(18)
(18)
(19)
(19)
(20)
(20)
IP8519_A
7 OF 11
INSTRUCTION SHEET
© 2019 nVent All Rights Reserved
TECHNICAL SUPPORT
www.nVent.com
nVent, nVent CADDY, nVent ERICO Cadweld, nVent ERICO Critec, nVent ERICO, nVent ERIFLEX, and nVent LENTON are owned by nVent or its
global affiliates. All other trademarks are the property of their respective owners. nVent reserves the right to change
specifications without prior notice.