background image

Nuvation Energy Grid Battery Controller

Installation Guide

Document ID: NE-IG-003 | Revision: 2.0, 2020-03-13

© 2020 Nuvation Energy

Содержание Grid Battery Controller

Страница 1: ...Nuvation Energy Grid Battery Controller Installation Guide Document ID NE IG 003 Revision 2 0 2020 03 13 2020 Nuvation Energy...

Страница 2: ...ety Information 1 1 Introduction 2 1 1 About this Guide 2 2 System Overview 3 3 Grid Battery Controller 5 3 1 Overview 5 3 2 Mechanical Dimensions 5 3 3 Electrical Connections 7 3 3 1 DC Power Connect...

Страница 3: ...rent capacities and so high voltage with high current capacity may be present while connecting Nuvation Energy BMS You must use proper electrical safety precautions when handling any part of Nuvation...

Страница 4: ...rid Battery Controller to your specific target application 1 1 About this Guide This Nuvation Energy Grid Battery Controller Installation Guide provides instructions to connect your Nuvation Energy Gr...

Страница 5: ...ration Depending on the system the individual stacks will be managed by either a Nuvation Energy High Voltage BMS via the Stack Controller or a Nuvation Energy Low Voltage BMS via the Battery Controll...

Страница 6: ...gure 2 Example single stack managed by a Stack Controller and connected to a Grid Battery Controller Nuvation Energy Grid Battery Controller Installation Guide Document ID NE IG 003 4 Rev 2 0 2020 03...

Страница 7: ...ents Current limiting algorithms for multi stack battery systems State of Charge algorithms for multi stack battery systems NTP client for BMS time synchronization The Grid Battery Controller uses a L...

Страница 8: ...Figure 3 Grid Battery Controller DIN Clip Location Nuvation Energy Grid Battery Controller Installation Guide Document ID NE IG 003 6 Rev 2 0 2020 03 13...

Страница 9: ...ding the DC power connector 3 3 1 DC Power Connector The DC power connector provides a nominal 24VDC to the Grid Battery Controller but will tolerate an input voltage between 19 2V and 28 8V At 24V it...

Страница 10: ...d ETH2 These ports manage two separate network connections which are named described as the external and internal networks The ETH2 port connects to the external network The external network provides...

Страница 11: ...n separated for the best operation of the battery pack Excessive network traffic on the internal network can interfere with the Grid Battery Controller management of the stacks Nuvation Energy Grid Ba...

Страница 12: ...technologies client requests emerging energy storage standards and other industry requirements The product specifications in this document therefore are subject to change without notice 2020 Nuvation...

Отзывы: