The information contained in this document provides details of

installation, operation and maintenance for installers and users of

the XB-EFA-8 Supply and Extract Ventilation Unit with Heat

Recovery.

This supply and extract air handling unit comprises a combination of

high efficiency centrifugal fans with EC motors, controls, a counterflow

design enthalpy type plate heat exchanger, and supply and extract 

filters,.

The unit casing includes highly absorbent acoustic treatment.

General information regarding performance and specifications for the

equipment may be obtained from the project specific 

documentation.

1.0 Unit Access

Note - This product is available in functionally identical Left and

Right hand variants. 

The unit Supply and Extract connections are positioned at one end of

the unit (room-side connections).

The corresponding Intake and Discharge connections are positioned at

the other end of the unit.

The unit must be installed with at least 600mm clearance from a wall

/ barrier on the access side (as required by ADF 2010).

With this clearance, access panels may be removed allowing unit 

filters to be changed, and the fans and heat exchanger may be 

inspected and cleaned as necessary.

2.0 Delivery of equipment

2.1 Receipt of equipment

All equipment is inspected prior to despatch and leaves the factory in

good condition. 

Upon receipt of the equipment an inspection should be made and any

damage indicated on the delivery note.

Particulars of damage and/or incomplete delivery should be endorsed

by the driver delivering the goods before offloading by the purchaser.

No responsibility will be accepted for damage sustained during the

offloading from the vehicle or on the site thereafter.

All claims for damage and/or incomplete delivery must be reported to

Nuaire within two days of receipt of the equipment.

2.2 Offloading and handling from the
delivery vehicle 

The weight of the unit modules and palletised items is displayed on

the unit rating plate or on the packaging. Some products have an

uneven weight distribution, and this will be indicated by labelling

where appropriate. Ensure that lifting and handling equipment is 

adequately rated.

Offloading and positioning of the equipment is the responsibility of

the purchaser.

Spreaders should be used when lifting with slings to avoid damage to

the unit casing. Care must be taken to ensure that slings are correctly

positioned to avoid crushing and twisting of the unit casing. 

Figure 1: Lifting.

2.3 Storage

The equipment must be stored in a dry, internal location. 

Ductwork connection apertures shall be sealed against the ingress of

dust, water and vermin. 

If the storage period is to exceed two months, contact Nuaire for 

guidance on the appropriate “mothballing” procedures.

Do not stack units, modules or components.

XB-EFA-8L-GT & XB-EFA-8R-GT

Supply & Extract Ventilation Unit with Heat Recovery 

Installation, Operating and Maintenance Instructions

The EMC Directive 

2014/30/EU

The Low Voltage 
Directive 

2014/35/EU

02. 05. 19. Leaflet Number 671714

Code description: 

Left Hand unit: XB-EFA-8L-GT 

Right Hand unit: XB-EFA-8R-GT 

Safety first! –before commencing any work ensure:

That all appropriate risk assesments have been carried 
out, and the required safety measures have been taken

That you understand the work required

That you are trained and competent to carry it out

Palletised.

Slings via spreaders fitted to unit with base frame.

Nuaire: A Trading Division of Polypipe Limited 

  Western Industrial Estate Caerphilly  United Kingdom  CF83 1NA  

T: 029 2088 5911  F: 029 2088 7033  E: [email protected]  W: www.nuaire.co.uk

1

Содержание XB-EFA-8L-GT

Страница 1: ...e thereafter All claims for damage and or incomplete delivery must be reported to Nuaire within two days of receipt of the equipment 2 2 Offloading and handling from the delivery vehicle The weight of...

Страница 2: ...nt must be earthed and earth bonded Means of local isolation for maintenance purposes are generally required by others Ensure that all mains connections are isolated 4 0 Commissioning Setting to work...

Страница 3: ...minimum starting voltage is 2 V Belimo Actuator The relay is used to power the 24 V AC face damper actuator Supply Voltage AC 207 253 V AC AC line Frequency Hz 47 53Hz Supply Current Total unit load...

Страница 4: ...Installation Operating and Maintenance Instructions XB EFA 8L GT XB EFA 8R GT 7 0 Unit Wiring Information Figure 2 4 02 05 19 Leaflet Number 671714...

Страница 5: ...FILTER BOTTOM DAMPER BLADE BLOWERS G3 FILTER ACCESS PANEL FILTER ACCESS COVER 5 02 05 19 Leaflet Number 671714 HANGING BRACKETS DAMPER ACTUATOR MAIN CONTROL FILTER ACCESS COVER G3 FILTER HEAT EXCHANGE...

Страница 6: ...GT XB EFA 8R GT 9 0 Unit Dimensions Figure 5 XB EFA 8L GT Left handed unit Figure 6 XB EFA 8R GT Right handed unit 1427 1596 1751 356 1244 1886 424 1240 26 140 65 140 28 1728 45 1240 45 26 140 65 140...

Страница 7: ...ructed from an advanced polymer that allows moisture transfer On no account replace the heat exchanger with a physically similar type without this facility as condensate leakage will occur 10 3 Fans a...

Страница 8: ...following general requirements should be noted 5 1 Where access to any part of equipment which moves or can become electrically live are not prevented by the equipment panels or by fixed installation...