1.0 Introduction

The Nuaire LPXBOXDC-2 unit is designed to provide 

mechanical supply and extract ventilation with heat

recovery.

The unit is fitted with two fans with independant adjustable

speed control. A plate heat-exchange constructed from 

aluminium is used to provide up to 70% heat recovery.

2.0 Installation

I

nstallation must be carried out by competent personnel 

conforming to all statutory and governing regulations

including the current wiring and CDM regulations.

Special attention must be paid to the size and weight of the

unit and the handling method to locate the unit in situ.

The unit is designed to be ceiling mounted in the horizontal

plane with access panel and condensate drain pipe on either

side.

The fan must be fitted indoors, away from any direct

sources of heat, water spray or moisture generation.

Temperature range -5

O

C to 40

O

C. 

Please note a clear working space is required around

the installed unit to allow the cover to be removed and

provide sufficient access for maintenance such as filter

change.

The fan is designed to be wired direct to the mains supply

through a fused spur isolator (by others).

With the unit fixed in position and working from underneath

the installation bring the mains wiring through the chosen

rubber cable entry grommet at the new connection box.

Additional grommeted holes are provided to allow additional

wiring to each blower.

Installation of the unit

The integral mounting bracket supplied with the unit can be

offered up to a chosen mounting position, the fixing points

marked through and the bracket installed with 4 screws

(by others). 

The unit can then be offered into position, locating the

tongues on the mounting bracket into the slots in the hold-

ing supports on either side of the unit. When positioned fix

the unit to the mounting bracket with M5 screws. 

Various damper/inlet spigot positions can be utilised as

required to suit the system ductwork and extract grilles. 

To reduce air leakage, spigots should be sealed to the unit

by silicone sealant or similar (by others). 

All inlet dampers are ’closed’ as knockouts when delivered

but can be opened using a sharp knife. (See figure 3). 

After the spigot has been fixed adjust the damper with a

screwdriver. (See figure 4). 

See figure 5 for spigot location and sizes.

The condensate drain must be connected via a trap into

either a suitable waste water system or to the outside of

the building. Ensure the pipe from the condensate drain falls

away from the unit. 

1

Leaflet Number 671390 July 2011

Figure 1.

LPXBOXDC-2 

Mechanical Ventilation with Heat Recovery

Installation and Maintenance

Figure 3.

Cut through the
acoustic foam round
the circumference of 
the damper.

Damper can be
swivelled on the 
2 body casing
hinges.

Figure 4.

When spigot is in
position, damper can
be adjusted using a
screwdriver.

Discharge

Intake

Intake

Extraction

Extraction

Supply

Access covers on underside.

Fixing screw holes for
M5 screws in the 
mounting bracket.

Holding supports 
either side of unit to allow
alternative mounting option.

Figure 2.

The EMC Directive 
2004/108/EC  
The Low Voltage 
directive 
2006/95/EC