
3. Unpacking, Installation and Wiring
— 3-6 —
3.3. Wiring
3.3.1. Connection of Cable Set
!
Caution : Do not cut the Motor cable to change the length shorter or longer or do
not hook it up to other cable. You need to separately purchase the cable
with specified length.
The standard cable length is available in 1, 2, 3, 4, 5, 6, 8, 10, 15, 20 and
30 meters.
!
Caution : Do not place the power lines (AC main power and Motor cable) and the
signal lines in close proximity. Do not tie wrap them and not to put in the
same duct or conduit.
!
Caution : When considerable vibrations are applied to the cable, fix the cable near
the connector so that no stress is applied to the connector part.
Fig 3-6: Connection of cable set
To CN3
To CN4
To ground terminal
Содержание EDD Megatorque Motor
Страница 8: ... Blank Page ...
Страница 92: ...4 RS 232C Communication and USB Communication 4 16 Input the command WWC for cancellation of Multi monitor ...
Страница 146: ...6 Operation 6 38 Blank Page ...
Страница 184: ...7 Operational Function 7 38 Blank Page ...
Страница 211: ...8 More Advanced Function 8 27 ...
Страница 246: ...8 More Advanced Function 8 62 Blank Page ...
Страница 332: ...9 Details of Command and Parameter 9 86 Blank Page ...
Страница 340: ...10 Maintenance 10 8 Blank Page ...
Страница 364: ...11 Alarm and Warning 11 24 Blank Page ...