32
BA_v2_eagle_parallel_EN_1-0
s
TaRT
-
up
6
Start-up
When carrying out any assembly and installation work on the coin validator,
always observe the following safety instructions:
•
The coin validator must only be connected by a trained electrician.
•
The coin validator is not suited for outdoor use.
•
Never use the coin validator if there is damage to the device or the
connecting cables.
•
Select the correct voltage for the coin validator (see label).
•
Pay attention to correct equipotential bonding in the vending machine.
•
Never pull the connecting cable of the coin validator from the machine
when a voltage is applied.
•
Pull out the mains plug of the machine before installing or dismounting
the coin validator.
To install the v
2
eagle in a machine with parallel BDTA/BACTA interface:
1
If necessary make individual settings via the switch blocks [
]/[
1
]
(cf. Chap. 7 Operation, p. 34)
.
2
Disconnect the machine from the mains supply.
3
Connect the coin validator to the machine via the BDTA/BACTA interface [
2
2
]
and the corresponding connecting cable.
4
For the BACTA version, connect the 10-pole sorter override interface [
4
] to the sorter
or machine control, if necessary.
5
Hang up the coin validator in the machine using the lateral mounting studs [
3
]/
3
].
6
Reconnect the mains supply to the machine.