
NRG INSTRUCTIONS
Windcube v2 Winter Performance Kit | Assembly Instructions
Windcube_v2_Winter_Package_Instructions
Rev. 8.0
[email protected] | Page 1
7 March 2018
SUMMARY
Below are instructions for installing the Winter
Performance Kit with Windcube Profiler Lidars. To
uninstall, follow the procedure in reverse order.
Please contact NRG Technical Services if there are
any questions during installation:
+1 (802) 482-2255 x3
COMPONENTS
Tent assembly
Heater Controller Box
Temperature probe
IR Sensor
Foam inserts
24V DC to Windcube
Temperature
Sensor
24V DC from Power Source
Heater Plate & IR Sensor
Connector for Wiper
Heater
Controller Box
Foam
Insert