![NRG Systems Windcube Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/nrg-systems/windcube/windcube_instructions-manual_1714009009.webp)
NRG INSTRUCTIONS
Windcube PV Trailer
Windcube_PVTrailer_ModerateClimate_Instructions
Rev. 2
[email protected] | Page 9
27 March 2018
2.
Connect Windcube cables
a.
DC supply side cable to trap door.
b.
Ethernet cable to LAN port.
3.
Install the antenna on the Antenna mount (see picture of mount in Section 3).
4.
Mount modem in PV Trailer shelter box.
a.
Locate the upper DIN rail, mount modem in place next to the Ethernet switch and connect with an
Ethernet cable.
b.
Connect Power Monitor and Windcube Ethernet cables to the switch.
c.
Connect 24V DC power cable to modem.
Section 6: Power Equipment On
1.
In shelter box, turn on the system by flipping the 2
nd
breaker first (Charge Controller), followed by the 1
st
(PV
Panel Power Input), and finally the 3
rd
, 4
th
, 5
th
breakers (Modem/Monitoring Power Supply):
1. PV Panel Input
2. Charge Controller
3. Modem/Monitoring Power Supply
NOTE: Always turn the Charge Controller ON first and OFF last