NRG Instructions
SRA System | All-Weather PVH Kit
SRA_All-Weather_PVH_Kit_Instructions
Rev. 5.0
[email protected] | Page 8
18 April 2018
Attach aluminum frame pieces to the panel frames through the slide nuts. Push the bolt head up against
the panel frame to create a gap between washer and slide nut (Figure 2-3). Make sure that the washer
remains between the extruded aluminum and panel (Figure 2-4).
Figure 2-3: Create space for aluminum rail.
Figure 2-4: Slide rail onto the slide nuts.
Determine which PV panel will be at the top, then make sure it is flush with the ends of the rails. If more
than one panel is included with your kit, leave a small (about 1/8”) gap between panels on the rails.
2.2.3 Assemble the top tower mount.
Use the diagonal cutters to cut the zip tie packaging holding together all aluminum rails. Remove the
hinged assembly with 12” and 25” rail sections. Remove the V-block/U-bolt assembly from the hardware
box (Figure 2-5, following page).