NRG Instructions
SRA System | All-Weather PVH Kit
SRA_All-Weather_PVH_Kit_Instructions
Rev. 5.0
[email protected] | Page 7
18 April 2018
SECTION 2: ASSEMBLING THE PV PANELS & BRACKETS
2.1 Open and unpack all items.
Your All-Weather PVH kit comes packaged in several boxes. Verify that all contents are present and
undamaged.
2.2 Construct the PV Frame
2.2.1 Attach the longest frame pieces (extruded aluminum, 65” length) to the PV panels.
Place PV panels on work surface face-down. Place multiple panels together with the long sides touching
each other. Be careful not to scratch glass surface.
Thread four 1/4-20x.375 hex bolts (#11052) through the PV panel holes indicated (Figure 2-1) and attach
1/4” flat washers and slide nuts (Figure 2-2).
Figure 2-1: PV panel with bolt holes indicated. Figure 2-2: Bolt/washer/nut alignment in PV panel frame.