NRG Instructions
SRA System | All-Weather PVH Kit
SRA_All-Weather_PVH_Kit_Instructions
Rev. 5.0
[email protected] | Page 16
18 April 2018
2.4 Mount 110S Temperature Sensor
Using the supplied band clamps, secure the 110S Temperature sensor to the tower directly above the
Shelter Box.
Figure 2-20: NRG 110S Temperature sensor attached to the tubular tower with band clamps.
2.5 Chain the Deep-Cycle Batteries Together
Place the battery (ies) in the black housing box(es).
When using kits 11709 or 11710, it will be necessary to chain the included 12V, deep-cycle batteries
using the supplied cables to create a battery bank.
These batteries contain a significant amount of energy. Use caution or serious injury may
result.
Place the batteries in the supplied battery boxes/enclosures so they are protected from weather
prior to making the connections.
Connect [+] to [+] on the batteries, and connect [-] to [-] using the 4 Gauge (AWG) battery
cables. Use black for [-] and red for [+] terminals.
Connect the 10 AWG 2C cable to the battery bank you have created. At a later step, this cable
will feed into the shelter box and connect to the control system.
Keep the bare ends of the 10 AWG 2C cable separated. Do not let them come in
contact with each other or you.