2 Technical Data
PCS-978 Transformer Relay
2-16
Date: 2013-01-16
2.7.14.2 Inverse-time Residual Overvoltage Protection
Pickup voltage setting [59G2.3U0_Set]
2~200V
Tolerance of voltage setting of IDMT OV
≤2.5% of setting or 0.1V, whichever is greater
Drop-off to pickup ratio
≥95%
Multiple of the maximum operating current to the pickup
setting [59G2.K_Iset]
10~40, 0.001 steps
Time multiplier setting [59G2.TMS]
0.05~3.2, 0.001 steps
Minimum delay setting [59G2.tmin]
0.0~20s, 0.001s steps
Constant K [59G2.K]
0.0~120, 0.001 steps
Constant C [59G2.C]
0.0~20s, 0.001s steps
Operating time of IDMT OV
≤2.5% of operating time or 30ms, whichever is greater
(for residual voltage between 1.2 and 2 multiples of
pickup)
Drop-off time
≤30ms
2.7.15 Undervoltage Protection
Voltage setting of DT UV [27.UVn.U_Set] n=1,2,3,4
10~100V
Lowest voltage threshold of voltage recovery
[27.U_Recov]
10~100V
Tolerance of voltage setting
≤2.5% of setting or 0.1V, whichever is greater
Drop-off to pickup ratio
≤102%
Operating time of UV at zero time delay
50Hz
≤20ms (at 0.8 times voltage setting)
60Hz:
≤20ms (at 0.8 times voltage setting)
Time setting of DT UV [27.UVn.t_Op] n=1,2,3,4
0.05~100s
Time setting of fault recovery [27.t_Recov]
0~100s
Tolerance of time setting
≤1% of s30ms (at 0.8 times voltage setting)
du/dt setting [27.du/dt_Blk]
0~100V/s
Drop-off time
≤30ms
2.7.16 Thermal Overload Protection
Base current setting range [49.Ib_Set]
0.04In~30In, 0.001In steps
Transformer thermal time constant [49.Tau]
0~100s, 0.001s steps
Thermal overload coefficient for trip [49.K_Trp]
1~3, 0.001 steps
Thermal overload coefficient for alarm [49.K_Alm]
1~3, 0.001 steps
Operating time
≤2.5% of operating time or 30ms, whichever is
greater(for current between 1.2 and 20 multiples of
pickup)
Drop-off time
≤30ms
Содержание PCS-978
Страница 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Страница 2: ......
Страница 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Страница 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Страница 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Страница 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Страница 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Страница 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Страница 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Страница 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Страница 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Страница 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Страница 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Страница 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Страница 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Страница 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Страница 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Страница 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Страница 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Страница 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Страница 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Страница 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Страница 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...