Operation
Theory
PCS-978 Transformer Relay
3-164
Date: 2013-01-16
When the protective function block is disabled, [x.50BF.St], and [x.50BF.Op] signals are both reset.
Default values of Inputs [x.50BF.En1] and [x.50BF
. En2] are “1” and [x.50BF.Blk] is “0” when those
inputs are not connected to external signals or settings.
3.19.4 Input and Output
50BF
I3P
Init
En1
En2
Blk
St
Op_t2
Op_t1
Alm_Curr
Alm_Init
Figure 3.19-2 Function block 50BF
Table 3.19-1 Input signals of function block 50BF
No.
Signal
Description
1
I3P
Three phase current data, including calculated residual current.
2
Init
Input signal of initiating breaker failure protection.
3
En1
Function enabling input1 and input 2, it can be binary inputs or settings, such as function
enabling binary inputs, logic links, etc.
4
En2
5
Blk
Function blocking input, such as function blocking binary input.
If the input is 1, the protection is not reset and time delay will be cleared.
Table 3.19-2 Output signals of function block 50BF
No.
Signal
Description
1
St
Breaker failure protection starts.
2
Op_t1
Delay 1 of breaker failure protection operates.
3
Op_t2
Delay 2 of breaker failure protection operates.
4
Alm_Init
Alarm message indicating the duration of receiving input signal of initiating breaker
failure protection is over 3s.
5
Alm_Curr
Alarm message indicating the duration of receiving current signal for breaker failure
protection is over 3s.
Above input signals and output signals can be used for programmable logic, and following output
signals are only for LCD display of equipment.
NOTE!
Symbol ”
x
” represents some side of transformer defined by user through
PCS-Explorer
software, which may be “H”, “HV” “HVS”, “HVS1”,” HVS2”, etc. If only one
protection element is equipped, the prefix “x.” may disappear.
Содержание PCS-978
Страница 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Страница 2: ......
Страница 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Страница 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Страница 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Страница 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Страница 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Страница 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Страница 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Страница 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Страница 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Страница 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Страница 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Страница 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Страница 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Страница 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Страница 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Страница 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Страница 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Страница 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Страница 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Страница 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Страница 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...