3
Operation
Theory
PCS-978 Transformer Relay
3-160
Date: 2013-01-16
3.18.5 Inputs and Outputs
49
I3P
Clr
En1
En2
Blk
St
Alm
Op
Figure 3.18-3 Function block 49
Table 3.18-1 Input signals of function block 49
No.
Signal
Description
1
I3P
Three phase current data, including calculated residual current.
2
Clr
Clear command of thermal accumulation value.
3
En1
Function enabling input1 and input 2, it can be binary inputs or settings, such as function
enabling binary inputs, logic links, etc.
4
En2
5
Blk
Function blocking input, such as function blocking binary input.
If the input is 1, the protection is not reset and time delay will be cleared.
Table 3.18-2 Output signals of function block 49
No.
Signal
Description
1
St
Protection starts.
2
Op
Protection operates.
3
Alm
Protection issues alarm signal.
Above input signals and output signals can be used for programmable logic, and following output
signals are only for LCD display of equipment.
NOTE!
Symbol ”
x
” represents some side of transformer defined by user through
PCS-Explorer
software, which may be “H”, “HV” “HVS”, “HVS1”,” HVS2”, etc. If only one
protection element is equipped, the prefix “x.” may disappear.
Table 3.18-3 Output signals of 49: report
No.
Signal
Description
1 x.49.Op
Thermal overload protection of x side operates to issue trip command.
Tripping reports of protection element.
2 x.49.Alm
Thermal overload protection of x side operates to issue alarm command.
Alarm reports of protection element.
3 x.49.St
Thermal overload protection of x side starts.
Содержание PCS-978
Страница 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Страница 2: ......
Страница 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Страница 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Страница 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Страница 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Страница 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Страница 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Страница 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Страница 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Страница 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Страница 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Страница 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Страница 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Страница 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Страница 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Страница 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Страница 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Страница 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Страница 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Страница 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Страница 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Страница 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...