19.0 MAINTENANCE INSTRUCTIONS 

Suggested Maintenance Schedule*   

  

  

Component 

Action 

Frequency 

Process Blower Motor 

Permanently lubricated -  

No Action required. 

Reactivation Fan Motor 

Rotor Drive Motor 
Process Filter  

Clean with compressed air  

or replace as necessary. 

Every 2 weeks 

Regeneration Filter 

Conveying Air Filter 

Plasticizer Drain 

Drain plasticizer into pan 

Every 2 weeks 

Receiver Filters 

Clean with compressed air  

or replace if necessary 

Every 2 weeks 

Process Heater  

Compare process temperature setting 

to hopper inlet temperature 

to make sure they are comparable. 

If they are not - Contact NOVATEC 

Service Department.  

Every 2 weeks 

Hose. Tubing & Clamps 

Check for leaks or holes. 

Tighten or replace as necessary. 

Every 2 months 

Hopper Gaskets & Seals 

Check for leaks 

Repair or replace as necessary. 

Every 2 months 

Pellet Screen 

Locate wire mesh at hopper return air 

 outlet and clean with compressed air. 

Every 2 months 

Rotor Drive Chain & 
Sprockets 

Lubricate 

Every 6 months 

Rotor Seals 

Do Not Disturb Except in an 

Emergency 

Rotor Rotation  

Preset at factory-No action required. 

Rotor speed should be 6-12 

rotations/hour. If outside this 

parameter, make sure the limit switch 

hump is re-setting the limit switch. 

 

*This schedule may have to be varied depending on the dust level and abrasiveness of the 
materials you are processing and the number of hours you are operating the dryer each week. 
 

 
 
 
 
 

Содержание NovaWheel NWB-100-DC

Страница 1: ...aWheel Dry Convey Dryers NWB DC Series With NovaTouch Monochrome Touch Panel PLC MODELS NWB 25 DC through NWB 200 DC 2014 NOVATEC Inc All Rights Reserved Instruction Manual NWB DC IM 3 JAN 2014 NWB DC...

Страница 2: ...properly respond to any of your requests Instruction Manual NWB DC IM 3 JAN 2014 Model ___________________________ Serial ____________________________ DISCLAIMER NOVATEC Inc shall not be liable for e...

Страница 3: ...RESSED AIR CONNECTION 12 7 0 HOPPER EXTENSIONS 12 8 0 ADJUSTABLE DIFFUSER CONE POSITIONING 12 9 0 SALES AND SERVICE 13 10 0 SHIPPING AND INSPECTION 13 11 0 PRINCIPLE OF OPERATION 13 11 1 Resin Drying...

Страница 4: ...7 Features List 26 17 2 8 Auto 2nd Setpoint Menu 27 18 0 NOVATEC SCREENS 28 18 1 Basic Machine Configuration 28 18 1 3 Configuration Menu 2 28 18 1 3 Configuration Menu 3 29 18 1 4 Reactivation Menu...

Страница 5: ...care to give you excellent service A wide range of NWB DC series dryers have been introduced to enable our valued customers to select the right model for their application These NWB DC NovaWheel Dry C...

Страница 6: ...ic area NOTE All models are shipped with casters installed except the 150 200 so while they are being supported by the fork lift attach one of the supplied casters under each corner of the frame using...

Страница 7: ...ine Mount Receiver Pickup Wand Material Hopper Control Panel Access Door Plasticizer Drain Pre Cooler Water IN OUT ON OFF Switch Panel Power ON Light Alarm Light Panel Process Filter Access Regen Filt...

Страница 8: ...n inlet stub to face direction from where material will be pulled Fasten the Receiver to the Hopper using the saved x 20 bolts and washers 2 B Place hose clamp over one end of flex hose and push end o...

Страница 9: ...form routine maintenance on the dryer and for safe operation 3 4 Install Machine Mount Receiver and Connect Flex Hose 3 A Bolt the Machine Mount Receiver to the process machine throat with user suppli...

Страница 10: ...ion Turn the Main Disconnect on the electrical panel door to the OFF position lock out the main power source and open the electrical enclosure Per the electrical diagram install the main power wire to...

Страница 11: ...for cleaning The water flow rates and the required customer connection sizes for different models are shown in the chart below NOTE Processor must use ID water hose to get proper flow NOTE Cooling wa...

Страница 12: ...st be installed at the processor s plant 8 0 ADJUSTABLE DIFFUSER CONE POSITIONING IMPORTANT FOR PROPER DRYING We have found that processors can improve the efficiency of their drying process by adjust...

Страница 13: ...Series dryer was engineered and designed to effectively remove moisture in the vapor state from hygroscopic plastic resins This process is accomplished by the continuously rotating desiccant wheel an...

Страница 14: ...ible hose to an appropriately sized vacuum receiver where the material is fed into the drying hopper as needed As the material passes through the drying hopper it is metered through a vacuum takeoff v...

Страница 15: ...lowback 80 120 psi 5 5 8 3 Bar Based on material bulk density of 38 lb ft3 Model NWB 25 DC NWB 50 DC NWB 75 DC NWB 100 DC NWB 150 DC NWB 200 DC Max Material Flow Lbs Hr kg hr 25 11 4 kg hr 50 22 7 kg...

Страница 16: ...sure Switches PS The air pressure differential across the process filter and the regeneration filter is monitored and the NovaTouch display will alarm and show when a filter needs to be cleaned or rep...

Страница 17: ...ys use the Green Red switch to START or STOP the dryer The Power Disconnect switch should only be used in True Emergency conditions Repeated use of Power Disconnect can cause dryer component failure 1...

Страница 18: ...s enabled or disabled The following options for entering values are available The current value is deleted when you enter the first character Enter the value again Use the and keys to move the cursor...

Страница 19: ...on Example or or an may appear on any screen or in any alarm message This is the indication that there is additional information available By pressing the symbol an information page will appear on the...

Страница 20: ...ghts Reserved Page 20 NWB DC IM 3 JAN 2014 15 2 Screen Maps For all operational functions available to processor The NOVATEC screen map defines all of the screens provided for all engineering function...

Страница 21: ...ate time stamp Press Gray button to enable changes Press each button where a change is required and keypad will appear Make entry then press after each entry Continue until all fields are correct Enab...

Страница 22: ...button to return to Quick Op screen OR enter the desired PROCESS SETPOINT on the Quick Op Screen Press Green ON switch to start the Process Heater Press the MENU button to access additional screens Se...

Страница 23: ...siccant wheel RPH The graphics on this screen will change appearance in accordance with the mode of operation From the Main Menu Screen you can set the status screen up to show selected items in a LAR...

Страница 24: ...unt for how many alarms are active It will disappear when the alarms clear or are cleared by operator intervention Alarm messages will appear on the Main Menu when the Messages button is pressed Alarm...

Страница 25: ...set as a password To enable the password and protect the screen enter the password and depress the associated pad The pad will show Enabled and the protection will become active after leaving this sc...

Страница 26: ...ach time the desiccant wheel rotates to ensure that adequate but not excess heat is used to maintain the dryer dew point performance while insuring that no excess heat is used and wasted Once the drye...

Страница 27: ...hine it is easier to re set a reduced drying temperature or shut the Process Heater OFF on the QuickOp screen but this menu can be used to put or remove the dryer from second set point while unattende...

Страница 28: ...18 1 Basic Machine Configuration There are 3 Basic Configurations These are set at the factory prior to shipping 18 1 2 Configuration Menu 1 1 8 1 3 Configuration Menu 2 Changing from F to C is a com...

Страница 29: ...st the output response for whether your system has a N O or N C water saver solenoid It is also used to turn the icons and functionality for the material control systems on or off 375 These values are...

Страница 30: ...they are comparable If they are not Contact NOVATEC Service Department Every 2 weeks Hose Tubing Clamps Check for leaks or holes Tighten or replace as necessary Every 2 months Hopper Gaskets Seals Ch...

Страница 31: ...from housing Replace the filter or clean it with compressed air reinstall filter re tighten the lock nut close filter access cover and turn the yellow knob to the locked position Turn the power ON an...

Страница 32: ...ccant rotor is considered a cleanable washable media the preferred method of cleaning is to blow dust out with low pressure compressed air and to reactivate the rotor at a maximum temperature of 380 F...

Страница 33: ...not resetting the limit switch reset the limit switch toward the rotor 19 8 Rotor Replacement Desiccant rotor removal is accomplished bas follows 1 Remove the hex nuts on the Top Plate Assy 2 Remove...

Страница 34: ...al using knife Also remove silicon sealant 3 Clean the plate surface 4 Apply fresh silicon sealant 5 Gently press the seal towards the plate make sure the seal s section does not get offset 6 After jo...

Страница 35: ...Temperature sensor connection loose or reversed Check set temperature for proper drying process temperature Ensure temperature probe is installed in the dryer outlet or in the hopper inlet Change blo...

Страница 36: ...g to the cooling coil and make sure the temperature is below 85 F and at the proper flow Check the dryer system hopper for any air leaks repair as required Reduce the moisture of the resin being loade...

Страница 37: ...CS 500 controls Central Drying Assemblies Vacuum Take off Boxes Heater Blower Units Surge Bins Silo Dehumidifiers Valves and Accessories VL VLP Series Loaders Drawer Magnets 5 YEARS WSB Blenders MaxiB...

Отзывы: