NovaTec NovaWheel NWB-100-DC Скачать руководство пользователя страница 13

 

 

 NWB-DC IM 3 JAN 2014        

© 2014 Novatec, Inc. All Rights Reserved

 

            

Page 13  

 

NWB-DC IM 3 JAN 2014 

9.0 SALES AND SERVICE 

 

NOVATEC maintains qualified sales, engineering, and service personnel to assist in any way 

possible. If you have any comments concerning the types of equipment which NOVATEC 
manufactures that might improve your process, or any questions concerning service, we urge you 
to contact us. Please have you Model and Serial Number handy. 

 Sales: 1-800-BEST-DRY 

●1-800-237-8379 ● Fax: 410-789-4638 ● [email protected] 

 Technical Service Department: 1-800-938-6682 

● 

[email protected]

  

 

10.0 SHIPPING AND INSPECTION 

Although NOVATEC uses reputed carriers to deliver products, it has no control over the products 
once it leaves the manufacturing facility. Upon receiving the products, thoroughly inspect all 
equipment inside and out for damage that may have occurred during shipment. If any damage is 
found, a claim should be filed immediately with your carrier. 

 

NOVATEC thoroughly tests and inspects all products before shipment. You are to make the piping, 
and electrical connections for final installation and commissioning. If there any problems, shut 
down the equipment and contact the NOVATEC Technical Service Department. 

 

11.0 PRINCIPLE OF OPERATION 

The NWB-DC Series is designed to convey moisture laden resin from a source container, dry it, 
and deliver it to the throat of a process machine. 

 

11.1 Resin Drying 

The NWB-DC NovaWheel Series dryer was engineered and designed to effectively remove 
moisture (in the vapor state) from hygroscopic plastic resins. This process is accomplished by the 
continuously rotating desiccant wheel and the three air streams (Process, Purge and 
Regeneration). The Process return air is exposed to an adsorbing media (desiccant wheel) in a 
sealed air stream, where the desiccant adsorbs the moisture from process air. After the desiccant 
has adsorbed the moisture, it is exposed to a Regeneration air stream which has been pre-heated 
to a temperature of about 380°F. (190°C).  This causes the moisture to be driven out from the 
desiccant and prepares it for more moisture adsorption. Now the desiccant media passes through 
third air stream called purge air stream. Here the desiccant media is cooled down by some of the 
process air before entering back into the process to provide for better performance. The three air 
streams (process, regeneration and purge) are separated by special Teflon fabric coated silicon 
seals.  The process air and regeneration air is compressed by using regenerative blowers. 
 
The dry air from the dryer is then heated to the desired drying temperature by an electric heater 
located in the NWB-DC cabinet. The hot dry air enters the hopper at the bottom and removes 
moisture vapor from the resin in the hopper.  The air from the top of the hopper is returned to the 
dryer, where it is filtered, passed through the desiccant wheel to remove moisture from the air 
stream and cooled before the process blower sends the air back through the heater and into the 
bottom of the hopper again in a continuous process.  

Содержание NovaWheel NWB-100-DC

Страница 1: ...aWheel Dry Convey Dryers NWB DC Series With NovaTouch Monochrome Touch Panel PLC MODELS NWB 25 DC through NWB 200 DC 2014 NOVATEC Inc All Rights Reserved Instruction Manual NWB DC IM 3 JAN 2014 NWB DC...

Страница 2: ...properly respond to any of your requests Instruction Manual NWB DC IM 3 JAN 2014 Model ___________________________ Serial ____________________________ DISCLAIMER NOVATEC Inc shall not be liable for e...

Страница 3: ...RESSED AIR CONNECTION 12 7 0 HOPPER EXTENSIONS 12 8 0 ADJUSTABLE DIFFUSER CONE POSITIONING 12 9 0 SALES AND SERVICE 13 10 0 SHIPPING AND INSPECTION 13 11 0 PRINCIPLE OF OPERATION 13 11 1 Resin Drying...

Страница 4: ...7 Features List 26 17 2 8 Auto 2nd Setpoint Menu 27 18 0 NOVATEC SCREENS 28 18 1 Basic Machine Configuration 28 18 1 3 Configuration Menu 2 28 18 1 3 Configuration Menu 3 29 18 1 4 Reactivation Menu...

Страница 5: ...care to give you excellent service A wide range of NWB DC series dryers have been introduced to enable our valued customers to select the right model for their application These NWB DC NovaWheel Dry C...

Страница 6: ...ic area NOTE All models are shipped with casters installed except the 150 200 so while they are being supported by the fork lift attach one of the supplied casters under each corner of the frame using...

Страница 7: ...ine Mount Receiver Pickup Wand Material Hopper Control Panel Access Door Plasticizer Drain Pre Cooler Water IN OUT ON OFF Switch Panel Power ON Light Alarm Light Panel Process Filter Access Regen Filt...

Страница 8: ...n inlet stub to face direction from where material will be pulled Fasten the Receiver to the Hopper using the saved x 20 bolts and washers 2 B Place hose clamp over one end of flex hose and push end o...

Страница 9: ...form routine maintenance on the dryer and for safe operation 3 4 Install Machine Mount Receiver and Connect Flex Hose 3 A Bolt the Machine Mount Receiver to the process machine throat with user suppli...

Страница 10: ...ion Turn the Main Disconnect on the electrical panel door to the OFF position lock out the main power source and open the electrical enclosure Per the electrical diagram install the main power wire to...

Страница 11: ...for cleaning The water flow rates and the required customer connection sizes for different models are shown in the chart below NOTE Processor must use ID water hose to get proper flow NOTE Cooling wa...

Страница 12: ...st be installed at the processor s plant 8 0 ADJUSTABLE DIFFUSER CONE POSITIONING IMPORTANT FOR PROPER DRYING We have found that processors can improve the efficiency of their drying process by adjust...

Страница 13: ...Series dryer was engineered and designed to effectively remove moisture in the vapor state from hygroscopic plastic resins This process is accomplished by the continuously rotating desiccant wheel an...

Страница 14: ...ible hose to an appropriately sized vacuum receiver where the material is fed into the drying hopper as needed As the material passes through the drying hopper it is metered through a vacuum takeoff v...

Страница 15: ...lowback 80 120 psi 5 5 8 3 Bar Based on material bulk density of 38 lb ft3 Model NWB 25 DC NWB 50 DC NWB 75 DC NWB 100 DC NWB 150 DC NWB 200 DC Max Material Flow Lbs Hr kg hr 25 11 4 kg hr 50 22 7 kg...

Страница 16: ...sure Switches PS The air pressure differential across the process filter and the regeneration filter is monitored and the NovaTouch display will alarm and show when a filter needs to be cleaned or rep...

Страница 17: ...ys use the Green Red switch to START or STOP the dryer The Power Disconnect switch should only be used in True Emergency conditions Repeated use of Power Disconnect can cause dryer component failure 1...

Страница 18: ...s enabled or disabled The following options for entering values are available The current value is deleted when you enter the first character Enter the value again Use the and keys to move the cursor...

Страница 19: ...on Example or or an may appear on any screen or in any alarm message This is the indication that there is additional information available By pressing the symbol an information page will appear on the...

Страница 20: ...ghts Reserved Page 20 NWB DC IM 3 JAN 2014 15 2 Screen Maps For all operational functions available to processor The NOVATEC screen map defines all of the screens provided for all engineering function...

Страница 21: ...ate time stamp Press Gray button to enable changes Press each button where a change is required and keypad will appear Make entry then press after each entry Continue until all fields are correct Enab...

Страница 22: ...button to return to Quick Op screen OR enter the desired PROCESS SETPOINT on the Quick Op Screen Press Green ON switch to start the Process Heater Press the MENU button to access additional screens Se...

Страница 23: ...siccant wheel RPH The graphics on this screen will change appearance in accordance with the mode of operation From the Main Menu Screen you can set the status screen up to show selected items in a LAR...

Страница 24: ...unt for how many alarms are active It will disappear when the alarms clear or are cleared by operator intervention Alarm messages will appear on the Main Menu when the Messages button is pressed Alarm...

Страница 25: ...set as a password To enable the password and protect the screen enter the password and depress the associated pad The pad will show Enabled and the protection will become active after leaving this sc...

Страница 26: ...ach time the desiccant wheel rotates to ensure that adequate but not excess heat is used to maintain the dryer dew point performance while insuring that no excess heat is used and wasted Once the drye...

Страница 27: ...hine it is easier to re set a reduced drying temperature or shut the Process Heater OFF on the QuickOp screen but this menu can be used to put or remove the dryer from second set point while unattende...

Страница 28: ...18 1 Basic Machine Configuration There are 3 Basic Configurations These are set at the factory prior to shipping 18 1 2 Configuration Menu 1 1 8 1 3 Configuration Menu 2 Changing from F to C is a com...

Страница 29: ...st the output response for whether your system has a N O or N C water saver solenoid It is also used to turn the icons and functionality for the material control systems on or off 375 These values are...

Страница 30: ...they are comparable If they are not Contact NOVATEC Service Department Every 2 weeks Hose Tubing Clamps Check for leaks or holes Tighten or replace as necessary Every 2 months Hopper Gaskets Seals Ch...

Страница 31: ...from housing Replace the filter or clean it with compressed air reinstall filter re tighten the lock nut close filter access cover and turn the yellow knob to the locked position Turn the power ON an...

Страница 32: ...ccant rotor is considered a cleanable washable media the preferred method of cleaning is to blow dust out with low pressure compressed air and to reactivate the rotor at a maximum temperature of 380 F...

Страница 33: ...not resetting the limit switch reset the limit switch toward the rotor 19 8 Rotor Replacement Desiccant rotor removal is accomplished bas follows 1 Remove the hex nuts on the Top Plate Assy 2 Remove...

Страница 34: ...al using knife Also remove silicon sealant 3 Clean the plate surface 4 Apply fresh silicon sealant 5 Gently press the seal towards the plate make sure the seal s section does not get offset 6 After jo...

Страница 35: ...Temperature sensor connection loose or reversed Check set temperature for proper drying process temperature Ensure temperature probe is installed in the dryer outlet or in the hopper inlet Change blo...

Страница 36: ...g to the cooling coil and make sure the temperature is below 85 F and at the proper flow Check the dryer system hopper for any air leaks repair as required Reduce the moisture of the resin being loade...

Страница 37: ...CS 500 controls Central Drying Assemblies Vacuum Take off Boxes Heater Blower Units Surge Bins Silo Dehumidifiers Valves and Accessories VL VLP Series Loaders Drawer Magnets 5 YEARS WSB Blenders MaxiB...

Отзывы: