
Page 7 of 14
1. Take all the components out from the packing crate.
2. Install the tooth support (part No.15) and tines (part No.16) onto the mounting
frame, and then tighten them with M10 x 30 bolt and M10 nut.
3.
Assemble the main frame weldment (part No.1) with the mounting frame using a
slotted nut and draw pin.
4.
Assemble the side bars (lift arms) (part No.7) and braces (part No.3) with the main
frame weldment.