background image

 
2.3 POSSIBLE PROBLEM.............................................................................. 
 

Even if the appliance is used correctly, some problems may arise for various 
reasons. The  table that follows  mentions  some possible  problems  and  some 
possible causes.

 

In  case  of  problem  we  control  first  if  the  electrical  supply  to  the 

machine is right or not. 

 

POSSIBLE PROBLEM 

POSSIBLE CAUSES 

 
 

Machine is not operating

 

Check if there is damage to 1) all 

heating elements 2) the edge of cord 

connected with the heating element 

3) connector strip

 

 

Heating element is not operating

 

Check if there is damage to 1) the 

heating element 2) the edge of cord 

connected with heating element 3) 

operation switch

 

Worm wheel is not operating 

Check if there is damage to 1)on/off 

switch 2) motor 3)the edge of cord 

connected with the motor 

 
2.3 REPLACEMENT OF ELECTRICAL ELEMENTS........................................ 

To replace the operation switch & the on/off switch of the motor unscrew the 4 
screw from the right side of the appliance. 
Remove the operation knob and the cover and make the replacement.   
To  replace  the  heating  element  unscrew  the  4  screws  from  the  right  side  of 
the appliance remove the screw from the left of the supporting sheet of metal 
disconnect the heating element from inside of the appliance and pull out the 
heating element and make the replacement 
To  replace  the  motor  unscrew  the  4  screws  from  the  right  side  of  the 
appliance  unscrew  the  ball  baring  base  and  the  worm  wheel  disconnect  the 
motor and replace it with a new one.   
 

CUT OFF THE POWER SUPPLY BEFORE COVER REMOVAL.  
 
2.4 TRAINING..................................................................................................... 

The  personnel  who  are  to  install  and  connect  the  appliance  must  train  the 
users  appropriately  so  that  they  can  handle  the  operation  and  safety 
measures of the appliance.  

ATTENTION !!!

 

  Check that main voltage in your working area is suitable for the settings on 

the label and that the appliance is properly earthed. 

 

  Before  any  service  activity  takes  place  or  any  parts  are  replaced  on  the 

appliance, make sure that pains supply is turned off. 

 
 

THE  MANUFACTURER  CANNOT  BE  HELD  RESPONSIBLE  FOR 
ACCIDENTS  AND  DAMAGE  CAUSED  TO  PERSONS,  ANIMALS  OR 
PROPERTY DUE TO NONCOMPLIANCE WITH THESE INSTRUCTIONS.  

Содержание HKB-7

Страница 1: ...th requirements of E E C 73 23 CCE E160335 1 02 60335 2 38 SOTIRIOS D PRODANAS CO PROFESSIONAL ELECTRIC GAS MACHINES FOR RESTAURANTS PATISSERIES SNACK BAR OFFICE FACTORY 14km National Road Thessaloniki Serron Liti C C 545 00 Tel FAX 00 30 23940 72770 73184 73185 P C 400 70 CC 560 00 www north gr e mail northgas spark net gr CE ...

Страница 2: ...Spit Distance mm Dist Spit Per Spit mm KG HKB 7 860 Χ 650 Χ 825 570 65 51 HKB 7S 860 Χ 650 Χ 1640 570 65 101 R7 690 Χ 380 Χ 440 440 65 40 Electrical Supply 400V AC 50 60Hz 3P Ν 230 400V AC 50 60Hz 3P N IP Grating ΙP 20 Appliance s Safety Complies to ΕΝ 60335 1 and 60335 2 38requirements CE marking Power MODEL POWER IN TOTAL HKB 7 10 400Watt HKB 7S 10 400Watt R7 6 500Watt ...

Страница 3: ...ollecting drawer Worm wheel Spits AISI 316 Electrical Components Wire Tubular heating elements 4 position switch On off switch Fire resistant wiring Terminals fasteners Gland for supply cord Earth terminal Equivalent earth terminal Connector strip for supply cord ...

Страница 4: ... face it In case of incongruence or if in doubt do not connect the apparatus Ask for the equipment to be checked by specialized personnel NORTH Water grill equipment is commercial grade appliances and should be used by personnel who are specially trained in their use All procedures concerning installation and connection of the appliance must be carried out exclusively by specialized technicians ac...

Страница 5: ...ASSEMBLY AND CONNECTION PROCEDURES TESTING AND REQUIRED REPAIRS MUST BE CARRIED OUT BY SPECIALIZED AND AUTHORIZED PERSONNEL ONLY NORTH ENTERPRISES CANNOT BE HELD RESPONSIBLE FOR ANY NEGATIVE CONSEQUENCES IN CASE OF INTERVENTIONS BY NON SPECIALIZED TECHNICAL PERSONNEL OR DUE TO NONCOMPLIANCE WITH FACTORY INSTRUCTIONS ...

Страница 6: ... Install the churrasco grill on a flat non flammable surface away from flammable walls 2 2 ELECTRICAL CONNECTION The appliance should be connected ONLY on 3phases electric power supply HO7RNF wire 5x2 5 Connect the phases to L1 L2 L3 Connect the earth neutral to Ν1 or Ν2 Connect the earth Electric fuse board is obligated to have escape relay IT IS STRONGLY RECOMMENDED TO USE A QUALIFIED ELECTRICIA...

Страница 7: ...e cover and make the replacement To replace the heating element unscrew the 4 screws from the right side of the appliance remove the screw from the left of the supporting sheet of metal disconnect the heating element from inside of the appliance and pull out the heating element and make the replacement To replace the motor unscrew the 4 screws from the right side of the appliance unscrew the ball ...

Страница 8: ...RTH CHURRASCO GRILL IS PROFESSIONAL EQUIPMENT ALL ASSEMBLY AND CONNECTION PROCEDURES TESTING AND REQUIRED REPAIRS MUST BE CARRIED OUT BY SPECIALIZED AND AUTHORIZED PERSONNEL ONLY NORTH ENTERPRISES CANNOT BE HELD RESPONSIBLE FOR ANY NEGATIVE CONSEQUENCES IN CASE OF INTERVENTIONS BY NON SPECIALIZED TECHNICAL PERSONNEL OR DUE TO NONCOMPLIANCE WITH FACTORY INSTRUCTIONS ...

Страница 9: ...osition 3 Both heating element are at maximum power Activate the on off switch of the motor for the rotation of spit If we unscrew the two screws clamp from the appliance left right and we push or pull the two moving handles simultaneous we can control the distance between spits and heating 3 2 CLEANING AND MAINTENANCE Turn off the heating elements before any cleaning or maintenance procedures Let...

Отзывы: