December 1994
Installing an additional Network shelf on the N/NT
This procedure is used when additional shelf space is required for DTI cards
in N or NT, 51, and 61 systems. A QUD15 cooling unit is required for each
additional shelf installed. When an additional shelf space is required, it may
be necessary to install a QCA108 network expansion cabinet to provide the
additional space.
1
Determine the cabinet and shelf location of the cards to be removed.
Note:
There are only two locations possible. They should be listed
behind the MSU and CPU.
2
Unpack and inspect the shelf.
3
Remove the existing left or right rear PE shelf (if required).
4
Install the additional Network shelf in the PE location. See Step 3
5
Install a QUD15 cooling unit directly below the Network shelf and
secure with four mounting screws.
6
Install and connect the QCAD172A power cable to the added QUD15
cooling unit as follows:
7
If the added QUD15 is located below the left Network shelf, unplug the
C11 connector from the QCAD111 power harness that connects to the
existing left side QUD15.
8
Plug the C11 connector into the single-ended connector of the
QCAD172A power cable.
9
Plug one of the two connectors at the other end of the C11 connector that
was removed.
10 Plug the remaining connector of the QCAD172A power cable into the
added QUD15.
CAUTION
The maximum number of DTI cards must not exceed three per shelf
because the Network shelf cable harness shares the power breaker
associated with each CPU.