
432 Chapter 37 Hardware procedures
241-7401-240 5.2S1
Unpacking and removing a seismic cabinet from a pallet
Unpack and remove a seismic cabinet in a dust-free area near the installation
site.
Procedure steps
1
Move the pallet close to where it is to be installed.
2
Remove and keep the packing slips and shipping papers attached to the
outside packaging.
3
Carefully cut the plastic stretch wrap around the cabinet.
4
Use a pair of tin snips to cut the banding that secures the cabinet
packaging.
5
Lower the ramp that is attached to the pallet as shown in “Lowering the
pallet ramp” (page 433).
WARNING
Risk of personal injury
The banding that secures the cabinet packaging is under
pressure and can fly up when cut.
WARNUNG
Verletzungsgefahr
Die Gehäuseverpackung ist mit einem Spannband
gesichert. Seien Sie vorsichtig beim Durchschneiden des
Bandes, da es möglicherweise mit Gewalt aufspringt.
Содержание Passport 7400
Страница 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 7401 240 5 2S1 ...
Страница 28: ...28 About this document 241 7401 240 5 2S1 ...
Страница 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Страница 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Страница 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Страница 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Страница 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Страница 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Страница 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Страница 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Страница 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Страница 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Страница 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Страница 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Страница 200: ...200 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 61 Installing a rear cover on a 5 slot Passport switch ...
Страница 228: ...228 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 77 16 slot Passport switch shelf assembly PPT 0892 001 AA ...
Страница 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 437: ......