Routing cables through a 3-slot Passport switch
Route cables through the built-in cable management assembly to termination
panels installed on the back of the switch.
Procedure steps
1
Route the cables from the faceplate of the processor card through the
cable guides at the side of the switch. See the figure “3-slot Passport
cable routing” (page 402).
If you install termination panels on the back of the switch, ensure the top
panel lines up with the top processor card. This simplifies cabling and
avoids overlap.
2
At the back of the switch, route the cables to the termination panels.
3
Label all processor card cables near the connector to indicate the node
name, slot number of the processor card, port number, and whether it is
a receive or transmit cable.
4
If desired, secure cables with cable ties. Always ensure you do not pinch
cables, especially fiber cables.
Содержание Passport 7400
Страница 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 7401 240 5 2S1 ...
Страница 28: ...28 About this document 241 7401 240 5 2S1 ...
Страница 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Страница 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Страница 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Страница 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Страница 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Страница 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Страница 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Страница 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Страница 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Страница 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Страница 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Страница 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Страница 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Страница 200: ...200 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 61 Installing a rear cover on a 5 slot Passport switch ...
Страница 228: ...228 Chapter 37 Hardware procedures 241 7401 240 5 2S1 Figure 77 16 slot Passport switch shelf assembly PPT 0892 001 AA ...
Страница 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Страница 437: ......