
Chapter 17 Hardware procedures 859
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Testing the power output from a system of ac rectifiers
Test the power output from a system of ac rectifiers to the BIP to prevent
inadvertent damage to equipment by verifying the polarity, connectivity, and
appropriate levels of power before the BIP is powered up.
Prerequisites
•
You must be familiar with “Safety considerations and best practices”
(page 53).
•
Test the power output connections from a system of ac rectifiers by
following the instructions provided by that product. When the system of
ac rectifiers is an MFA150 power system, ensure that you have done
“Checking power output from a system of ac rectifiers” (page 266) and
then follow the testing instructions provided in the Astec document 167-
9021-133 Advanced Power Systems MFA150 Modular Front Access
Power System Detailed Installation Guidelines and Procedures Manual.
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......