Chapter 17 Hardware procedures 633
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Loading cards in sequence with software
Load cards in sequence with software to confirm each card’s ability to
successfully accept the software.
Prerequisites
•
You must be familiar with “Safety considerations and best practices”
(page 53).
•
You need access to 241-5701-270 Passport 7400, 15000, 20000 Software
Installation Guide.
•
Cards that were shipped installed but unseated (in the transportation
position) at the factory have already been loaded with basic software.
•
The LEDs of seated cards prior to loading software are green for the
fabrics or amber for the CPs and FPs.
Procedure steps
1
Lift the latches of the CP in slot 0 and slide it gently into the slot until you
feel it engage the backplane. Once engaged, powering up the CP begins.
2
Observe the CP’s LEDs complete the following cycle:
a.
solid red (a final state), indicating powering up or after power-up, or
is being reset or restarted; during solid red, the hardware and fabric
backplane is tested and initialized; if there is a problem, the CP
reboots and remains solid red
b.
flashing red (an intermediate state), indicating that initializing and
testing the fabric backplane has passed and the CP software is
loading
c.
solid amber (a final state), indicating the software is not yet loaded or
configured for that CP, that is, the slot is unconfigured
d.
slow flashing green (an intermediate state), indicating the software
has been loaded and the applications are being initialized
e.
solid green (a final state), indicating power is on, software is loaded,
the CP is in service operating normally, and is the active CP.
If the LED stays red, remove the CP and use a flashlight to inspect
the pins inside the slot at the backplane. If any are bent, contact your
local Nortel Networks support representative. If none are bent, gently
insert a replacement CP and observe the LED cycle again.
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......