
480 Chapter 17 Hardware procedures
241-1501-240 5.2S2
Figure 171
Installing mounting ears on a multiport aggregate device
3
If you are installing the first panel on the rack, connect the grounding wire
(supplied separately by Nortel Networks) to the top right securing screw.
or
If you are installing the lowest panel on the rack, secure the bottom of the
grounding strip and a grounding wire to the rack with a screw.
4
Position the device between the uprights of the mounting apparatus to
allow at least 90 cm (36 in.) clearance in front of the device for operator
access. Allow at least 10 cm (4 in.) clearance at the rear of the device for
cable connections.
5
Fasten the 4 provided 5/16-in. screws through the mounting ears into the
cabinet or rack.
PPT 2841 004 AA
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......