Chapter 25 — Fault locating and clearing
Page 503 of 536
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
Clearing trunk faults
Trunk faults
Trunk circuit cards provide the interface between the system and Central
Office (CO) trunks, or between PBXs. The maintenance telephone can be
used to test trunks. The Universal Trunk card provides four trunk units, each
of which can be connected to a trunk configured to operate as one of the
following:
•
Central Office trunk
•
Direct Inward Dialing (DID) trunk
•
Two-way Tie, Dial Repeating (2DR)
•
Two-way Tie, Outgoing Automatic Incoming Dial (OAID) trunk
•
Recorded Announcement (RAN) trunk
•
Music trunk
•
Paging trunk
Trunk faults can cause problems (such as noise) on outside calls and can keep
calls from entering or leaving the system.
Fault clearing procedures
Manual Continuity Tests can be used to isolate Network and Peripheral
Equipment faults. See “LD 30” in the Option 11C Compact software guide
for details on performing the tests.
lists common trunk fault indications. To clear faults, select the
symptom listed in this section that most resembles the fault indications and
go through the procedure for clearing each possible cause until the fault is
fixed. Once the fault is corrected, disregard the remaining possible causes.
Clear any power or Common Equipment faults before attempting to clear
trunk faults.
If the fault is not cleared after you have gone through each possible cause,
check the most recent fault indications. Also check
to see if another type of fault is indicated.
Содержание Meridian Meridian 1
Страница 3: ...553 3121 210 Standard 3 0 January 1999 ...
Страница 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Страница 89: ...Page 70 of 536 Chapter 6 Bracing cabinets against earthquakes 553 3121 210 Standard 3 0 January 1999 ...
Страница 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Страница 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Страница 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Страница 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Страница 139: ...Page 120 of 536 Chapter 13 Installing the circuit cards 553 3121 210 Standard 3 0 January 1999 ...
Страница 157: ...Page 138 of 536 Chapter 15 Installing and connecting SDI and Ethernet ports 553 3121 210 Standard 3 0 January 1999 ...
Страница 175: ...Page 156 of 536 Chapter 16 Starting up and testing the system 553 3121 210 Standard 3 0 January 1999 ...
Страница 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Страница 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Страница 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 455: ...Page 436 of 536 Chapter 24 Changing pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...