Chapter 20 — Meridian Mail Compact Option installation and maintenance
Page 295 of 536
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
Procedure 67
View SEERs for a given period
1
From the Main Menu on the system administrator’s terminal, choose “5
System Status and Maintenance”
→
“5 System Event and Error
Reports”.
2
On the System Event and Error Reports form, enter the appropriate
dates and times in
Report Period Start and Report Period End.
3
Press the [View Reports] softkey.
The reports provide you with a brief description of the system event or
error and when it occurred. For a more detailed description consult
Maintenance Messages (SEERs) Reference Manual (NTP
555-7001-510).
—————————— End of Procedure ——————————
Maintaining the external tape drive
To ensure reliable tape drive performance, you should establish a regular
cleaning schedule and observe the following precautions:
•
Avoid mounting the tape drive where it is subjected to continuous shocks
or vibrations.
•
Maintain a clean, dust-free environment within the temperature and
humidity limits listed in the specifications of the Option 11C Compact
system.
•
Keep all liquids away from the drive and tapes to prevent spills into the
equipment.
•
Exercise reasonable care when using and storing tape cartridges. Do not
place cartridges on the Option 11C Compact cabinet or the monitor of the
system administrator’s terminal.
•
When a stored tape is moved to an environment with a greatly different
temperature, allow the tape to slowly reach room temperature before
using it.
•
Do not open the cartridge access door or touch the tape.
•
Keep the tape drive turned on when it is connected to Meridian Mail
Compact Option.
Содержание Meridian Meridian 1
Страница 3: ...553 3121 210 Standard 3 0 January 1999 ...
Страница 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Страница 89: ...Page 70 of 536 Chapter 6 Bracing cabinets against earthquakes 553 3121 210 Standard 3 0 January 1999 ...
Страница 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Страница 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Страница 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Страница 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Страница 139: ...Page 120 of 536 Chapter 13 Installing the circuit cards 553 3121 210 Standard 3 0 January 1999 ...
Страница 157: ...Page 138 of 536 Chapter 15 Installing and connecting SDI and Ethernet ports 553 3121 210 Standard 3 0 January 1999 ...
Страница 175: ...Page 156 of 536 Chapter 16 Starting up and testing the system 553 3121 210 Standard 3 0 January 1999 ...
Страница 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Страница 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Страница 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 455: ...Page 436 of 536 Chapter 24 Changing pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...