Chapter 20 — Meridian Mail Compact Option installation and maintenance
Page 251 of 536
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
Meridian Mail Compact Option upgrade
This section explains how to perform a comprehensive upgrade on your
Meridian Mail Compact Option system. This operation is performed when an
Meridian Mail Compact Option system requires upgrading because of a new
internal upgrade of the software release (for instance, from xx.05 to xx.06),
features, hardware, or storage during a new equipment installation.
What to do before you begin
Checklist
Review the following points before installation of the software:
•
Determine the port capacity of your Meridian Mail Compact Option
system.
•
Make sure that there is paper in the printer. (If your printer runs out of
paper during the procedure, your screen will freeze.)
•
Enable your terminal’s autoprint mode (<Control><W> followed by
<P>) in order to capture everything that appears on your screen. If you
have to reboot the system for any reason, you will have to reenable the
auto-print mode.
•
Have your Meridian Mail Compact Option Install/data tape available.
•
Have the keycode available. For information on keycodes, see
.
•
Verify that all the appropriate hardware is installed, particularly the
hardware associated with the features defined in your keycode. If
additional hardware needs to be added, obtain the hardware. Refer to this
guide for more details on hardware and hardware installation.
Performing a comprehensive upgrade
The procedures that follow provide information about performing a
comprehensive upgrade on the Meridian Mail Compact Option system. It is
intended to be as general as possible so that customers with varying platforms
can use it.
The procedure has several parts. The first part is common to all platforms and
must be performed for all comprehensive upgrades.
Содержание Meridian Meridian 1
Страница 3: ...553 3121 210 Standard 3 0 January 1999 ...
Страница 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Страница 89: ...Page 70 of 536 Chapter 6 Bracing cabinets against earthquakes 553 3121 210 Standard 3 0 January 1999 ...
Страница 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Страница 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Страница 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Страница 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Страница 139: ...Page 120 of 536 Chapter 13 Installing the circuit cards 553 3121 210 Standard 3 0 January 1999 ...
Страница 157: ...Page 138 of 536 Chapter 15 Installing and connecting SDI and Ethernet ports 553 3121 210 Standard 3 0 January 1999 ...
Страница 175: ...Page 156 of 536 Chapter 16 Starting up and testing the system 553 3121 210 Standard 3 0 January 1999 ...
Страница 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Страница 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Страница 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 455: ...Page 436 of 536 Chapter 24 Changing pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...