Chapter 13 – Installing the circuit cards
Page 115 of 536
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
NTMW02 Meridian Mail CPU
The NTMW02 Meridian Mail CPU card can be equipped with up to two
NTMW03 4 Port Mail DSP daughterboard, each providing four ports of voice
mail (maximum eight ports). Refer to the Meridian Mail Compact
documentation for detailed descriptions and to
“Chapter 20 — Meridian Mail Compact Option installation and
maintenance” on page 193
for installation instructions.
NTMW04 DTI/PRI
The NTMW04 DTI/PRI Card supports 1.5 Mb digital trunks and can run in
free run or slave operation. Refer to the 1.5 Mb Administration and
Maintenance Guide for further details.
NTMW05 24DLC
The NTMW05 24 Port Digital Line Card supports 24 voice ports, Aries
telephone sets and M2250 Attendant Consoles.
Procedure 7
24DLC installation
1
Insert the NTMW05 card in its assigned slot.
The NTMW05 card can be installed in any peripheral equipment slot.
2
Connect an NE-A25B type 25 pair cable from the connector on the
faceplate of the NTMW05 to the cross-connect terminal.
3
Configure and enable the card using overlay programs 11 and 32.
—————————— End of Procedure ——————————
Содержание Meridian Meridian 1
Страница 3: ...553 3121 210 Standard 3 0 January 1999 ...
Страница 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Страница 89: ...Page 70 of 536 Chapter 6 Bracing cabinets against earthquakes 553 3121 210 Standard 3 0 January 1999 ...
Страница 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Страница 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Страница 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Страница 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Страница 139: ...Page 120 of 536 Chapter 13 Installing the circuit cards 553 3121 210 Standard 3 0 January 1999 ...
Страница 157: ...Page 138 of 536 Chapter 15 Installing and connecting SDI and Ethernet ports 553 3121 210 Standard 3 0 January 1999 ...
Страница 175: ...Page 156 of 536 Chapter 16 Starting up and testing the system 553 3121 210 Standard 3 0 January 1999 ...
Страница 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Страница 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Страница 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 455: ...Page 436 of 536 Chapter 24 Changing pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...