Page 95 of 536
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
106
Chapter 12 – Adding an expansion
cabinet
General information
of this chapter describes how to install expansion
cabinets using the 10 m (33 ft) plastic fiber optic cable.
Note: The information contained in this chapter applies to both the
Option 11C Compact and Compact Hospitality unless stated otherwise.
Cabinet configurations
Cabinets are designed to be mounted on a wall. Refer to the
for details about equipment layout planning.
Fiber optic equipment
The following fiber optic equipment is required when adding an expansion
cabinet:
•
A0632902 Plastic Fiber Optic Cable
This is a 10 m (33 ft) long cable used as a connection between the two
cabinets.
•
NTDK22 Fiber Expansion daughterboard
Mounts on the NTMW01 SSC card to provide a fiber optic cable
interface connection in the main cabinet.
•
NTMW10 Fiber Receiver card
Mounts in the expansion cabinet to provide a fiber optic cable interface
connection in the expansion cabinet.
Содержание Meridian Meridian 1
Страница 3: ...553 3121 210 Standard 3 0 January 1999 ...
Страница 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Страница 89: ...Page 70 of 536 Chapter 6 Bracing cabinets against earthquakes 553 3121 210 Standard 3 0 January 1999 ...
Страница 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Страница 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Страница 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Страница 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Страница 139: ...Page 120 of 536 Chapter 13 Installing the circuit cards 553 3121 210 Standard 3 0 January 1999 ...
Страница 157: ...Page 138 of 536 Chapter 15 Installing and connecting SDI and Ethernet ports 553 3121 210 Standard 3 0 January 1999 ...
Страница 175: ...Page 156 of 536 Chapter 16 Starting up and testing the system 553 3121 210 Standard 3 0 January 1999 ...
Страница 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Страница 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Страница 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 455: ...Page 436 of 536 Chapter 24 Changing pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...