background image

   

Part No. 204518-B
April 2000

4401 Great America Parkway
Santa Clara, CA 95054

Installing the Passport 8010 
Chassis

Содержание Ethernet Routing Switch 8010

Страница 1: ...Part No 204518 B April 2000 4401 Great America Parkway Santa Clara CA 95054 Installing the Passport 8010 Chassis ...

Страница 2: ...environment This equipment generates uses and can radiate radio frequency energy If it is not installed and used in accordance with the instruction manual it may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case users will be required to take whatever measures may be necessary to correct the in...

Страница 3: ... Chassis does not exceed the Class A limits for radio noise emissions from digital apparatus as set out in the Radio Interference Regulations of the Canadian Department of Communications Règlement sur le brouillage radioélectrique du ministère des Communications Cet appareil numérique Passport 8010 Chassis respecte les limites de bruits radioélectriques visant les appareils numériques de classe A ...

Страница 4: ...iv ...

Страница 5: ...ng the chassis Instructions for installing one or more power supplies in the chassis Instructions for installing cable guides Instructions for installing a module in the chassis Specifications for the chassis For information about available switch modules for this chassis consult your Nortel Networks Reseller For detailed information about setting up your network and using Nortel Networks switches...

Страница 6: ... this illustration Typical racks with these dimensions are the Chatsworth Products Inc CPI rack and the B Line rack At least 6 inches 15 2 cm exists between adjacent equipment racks to allow airflow and cooling Adequate front and side clearance exists for cables One module may have up to 48 ports Allow enough space at the left of the chassis for cables and cable management hardware Ambient tempera...

Страница 7: ...odule purchased separately 7 Rack mounting brackets 8 Screws for brackets and equipment rack 9 Cable guides For detailed information about the comm port cable for the Passport 8132TX Switch Module refer to the documentation that was shipped with that module To purchase a replacement shipping carton assembly for the Passport 8010 Chassis contact the manufacturer Tharco at 1 800 772 2332 9073FA 1 2 ...

Страница 8: ...ke sure the attachment holes in the bracket match the holes in the chassis 2 Insert the supplied flat head screws to fasten each bracket to the chassis Note Each bracket fits only one side of the chassis If the mounting holes do not line up between a bracket and the chassis try that bracket against the other side of the chassis 9103FA 9104FA ...

Страница 9: ...hassis in a Rack Required tool Phillips screwdriver 1 Slide the chassis into the rack 2 Insert and tighten the rack mounting screws To complete the installation process refer to Installing the Power Supply 9074FA 9075FA ...

Страница 10: ...ote If you are installing a power supply in a new chassis be sure to remove the bag of dessicant from the middle power supply bay 3 Align and tighten the retaining screws 4 Connect the power cord to the power supply and to an AC power outlet that is on a circuit with no other equipment connected to it Connect each power supply in the chassis to a separate AC circuit 8959FA 8960FA ...

Страница 11: ...ith more than five installed modules requires a minimum of two power supplies for a nonredundant configuration A redundant configuration for such a chassis requires three power supplies In a chassis with a nonredundant power supply configuration if one power supply fails the system loses power and network connectivity In a chassis with two installed power supplies you can add a third power supply ...

Страница 12: ...o the bundled cables will not obstruct airflow to the right side of the chassis 1 Loosen but do not remove the rack mounting screws needed to install one cable guide 2 Slide the guide onto the loosened screws 9105FA 9106FA 3 Tighten the screws to secure the guide to the chassis 9107FA ...

Страница 13: ...er panel from a module slot 2 Make sure the inserter extractor levers are rotated away from the front of the module 9058FA 9059FA 3 Align the module circuit board with the card guides in the chassis Slide the module into a slot in the chassis until the module touches the backplane connectors 4 Rotate the inserter extractor levers to seat the backplane connectors 9060FA 9070FA ...

Страница 14: ...ating humidity 85 maximum relative humidity noncondensing Storage humidity 95 maximum relative humidity noncondensing Operating altitude 3 024 m 10 000 ft Physical Specifications Height 22 9 in 58 2 cm Width 17 5 in 44 5 cm Depth 19 9 in 50 5 cm Weight Empty 85 lb 39 kg Weight Fully Loaded 225 lb 101 kg Cooling System Fan Trays 2 per chassis Fans 8 per fan tray Thermal Sensors One per fan tray ...

Страница 15: ...um Input Power 2224 W maximum Input Voltage 100 240 VAC Input current 12 to 6 A per line cord Thermal rating 7584 BTU per hour maximum Electromagnetic Immunity RF Susceptibility IEC801 3 Level 2 Electrostatic discharge ESO IEC801 2 Level 2 3 Electrical Fast Transitions EFT B IEC801 4 Level 1 2 Electromagnetic Emissions Meets requirements of USA FCC CFR 47 Part 15 Subpart B Class A Canada ICES 003 ...

Страница 16: ...12 ...

Отзывы: