
1-20
Getting started
Installation tools and materials checklist
Standard 1.0
Nortel Symposium Call Center Server
May 1998
1001t Hardware Installation Guide
Installation tools and materials checklist
Introduction
Use this checklist for the tools and materials you will use for the
installation.
Check
Description
Phillips head screwdriver (Swiss Army knife
recommended)
Slot head screwdriver
Sidecutters
Needle-nose pliers for removing loose parts
Tape measure for determining cable lengths
Cable terminating tools for 10BaseT
ESD wrist strap for handling circuit boards
Pen for notes and for writing down cable lengths
and cable identifications
Flashlight for examining interior of chassis
Windows NT emergency repair disk
10BaseT cable for ELAN
RJ45 connectors for LAN cables
Cable tie wraps
Cable identification labels
Labels for server IP ELAN and CLAN addresses
Содержание 1001t
Страница 2: ...P0879480 ...
Страница 4: ......
Страница 10: ...viii Contents Standard 1 0 Nortel Symposium Call Center Server May 1998 1001t Hardware Installation Guide ...
Страница 12: ...x Procedures Standard 1 0 Nortel Symposium Call Center Server May 1998 1001t Hardware Installation Guide ...
Страница 122: ...Reader Response Form Reader Response Form ...
Страница 123: ......