![Nortek Mighty Mule MM271 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/nortek/mighty-mule-mm271/mighty-mule-mm271_installation-manual_1706010019.webp)
Gate Operator Installation Checklist
Telephone Mighty Mule Sales: 1-800-543-4283 • Fax (850) 575-8912
or Mighty Mule Technical Service: 1-800-543-1236 • Fax (850)575-8950
Copyright
©
2019 Nortek Security and Control, LLC.
❑
1. The gate has been checked to make sure it is level and moves freely in both directions.
❑
2. Potential pinch areas have been guarded so as to be inaccessible OR have sensing edges and/or
photo beam obstruction detection devices installed.
❑
3. The installer has inst
a
lled one or more contact or non-contact obstruction sensing devices, if
required for this installation.
❑
4. If pedestrian traffic is expected, a separate pedestrian gate has been installed, a minimum of
seven feet from the gate system. All pedestrian traffic must use the pedestrian gate.
❑
5. Warning signs have been installed on each side of the gate in highly visible locations. These
signs must remain at all times.
❑
6. There are no controls installed on the gate operator, or within 10 feet of the gate.
❑
7. The Dual Sense Technology™ feature has been properly adjusted to the minimum operational
setting for your application..
❑
8. Reviewed and understand all of the operational functions, obstruction sensing devices, warning
beeper and reset, etc.
❑
9. Review and understand the proper use of the operator’s manual disconnect feature. The manual
disconnect must never be used while the gate is in motion. The power switch must be turned off
before using the manual disconnect and disengaging the operator.
❑
10. Reviewed all safety instructions, and keep the safety instructions and owner’s information sheets
for reference.
❑
11. Review and understand the maintenance schedule for both the gate and the gate operator.