30 / Installation
Modular ICS 5.0 Companion Installer Guide
P0941568 01
To mount a base station:
1. Fasten the bracket into position using two #8 38-mm
(1½-in.) screws.
2. Route the cable from the ICS through the top (or bottom)
opening.
3. Wind any excess cable around the posts to secure it, then
fasten it under the strain relief.
4. Connect the wires to the BIX connector on the bracket
termination board as shown in the following illustration.
The polarity of the TCM connections is not important. If
two power pairs are brought in, they must be connected
with the same polarity to the base station bracket
termination board.
Bracket termination board
Ensure that the RPI is off before connecting power
pairs to the base station.
-PWR(1)
TCM
+PWR(1)
+PWR(2)
-PWR(2)
TCM
RJ11 jack
RJ11 jack
TCM
-Power 1
-Power 2
TCM
+Power 1
+Power 2
Содержание Modular ICS 5.0 Companion
Страница 2: ......
Страница 130: ...124 Glossary Modular ICS 5 0 Companion Installer Guide P0941568 01 ...