![Norsat GLOBETrekker Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/norsat/globetrekker/globetrekker_user-manual_1705618025.webp)
© Norsat International Inc.
(“Norsat”) All Rights Reserved
2021-03-22 037685 Rev B
25
2.8 Assembling the Struts (Optional)
1.
Optional: Struts are provided with some antennas to support the upper boom arm. Thread the two
halves of the struts together, taking care to not cross-thread the tapped holes.
Figure 17: Assemble the Structs
2.
Retract the spring loaded collar and slide the strut onto the ball joints on the sides of the antenna
and the sides of the upper boom arm.
Figure 18: Install the Structs
2.9 Connecting Peripherals to your System
2.9.1 Daylight Readable Touch Screen Display
1.
Connect the Daylight readable touch screen display to the monitor port of the
[Subject]
Base.