© 2021 Nordson Corporation
7446567-02
5-2
Startup
1.
Make sure all fittings, connections, and air lines are tightened securely. Refer to
Installation
for additional information.
2. Connect main air supply hose and set main air input regulator to 80 psi (5.51 bar, 0.56
MPa) ) minimum.
3. Connect material supply hoses to material inlet ports and start supply, if necessary.
Refer to the supply documentation for additional information.
4. Start the controller, if necessary. Refer to the controller manual for additional
information.
5. Start any temperature controller units on the system, if necessary. Refer to the
temperature controller manual for additional information.
6. Wait until the controller gives a, “Dispense Ready”, signal.
Shutdown
1.
Turn off and relieve pressure from any supply on the system. Refer to the supply
component manuals for additional information.
2. Relieve the air and material pressure from the Smart Gun.
3.
Turn off any temperature controller units on the system. Refer to the temperature
controller manual for additional information.
4.
Turn off the system controller. Refer to the controller manual for additional information.
NOTE:
Refer to the
System Manual
supplied with the Smart Gun for additional
information.
Содержание Smart Gun
Страница 18: ...2021 Nordson Corporation 7446567 02 4 4 Installation This page is intentionally left blank...
Страница 38: ...2021 Nordson Corporation 7446567 02 10 8 Disassembly and Assembly This page is intentionally left blank...
Страница 46: ...2021 Nordson Corporation 7446567 02 11 8 Parts Figure 11 4 Valve Cartridge Assembly 1 2 3 4 5 6 7 9 10 12 11 8...