FoamMix Flex Foaming System
78
Part 1129048_01
E
2020
Nordson Corporation
Maintenance
For equipment maintenance details refer to the following product manuals:
S
Bulk Melter/Unloader
S
Pro‐Meter VDK dispensing module
S
FoamMix Flex foaming station
Recommended Maintenance Schedule
This is a recommended schedule for maintaining the Pro‐Meter VDK
controller:
Activity
Interval
Clean air filters on cooling fan and vent
Monthly
Replace the PanelView Plus backup battery with a
CR2032 battery
Every three (3)
years
Gas Check Valve Assembly Maintenance
You will need the following items:
S
3/8‐inch Allen wrench
S
5 mm Allen wrench
S
6 mm Allen wrench
S
3/16‐inch socket wrench
Содержание FoamMix Flex
Страница 6: ...Table of Contents iv Part 1129048_01 E 2020 Nordson Corporation...
Страница 29: ...FoamMix Flex Foaming System 23 Part 1129048_01 E 2020 Nordson Corporation This page intentionally left blank...
Страница 63: ...FoamMix Flex Foaming System 57 Part 1129048_01 E 2020 Nordson Corporation This page intentionally left blank...
Страница 67: ...FoamMix Flex Foaming System 61 Part 1129048_01 E 2020 Nordson Corporation This page intentionally left blank...
Страница 93: ...FoamMix Flex Foaming System 87 Part 1129048_01 E 2020 Nordson Corporation This page intentionally left blank...
Страница 104: ...FoamMix Flex Foaming System 98 Part 1129048_01 E 2020 Nordson Corporation This page intentionally left blank...
Страница 105: ......
Страница 106: ......