
2 Assembly and installation
BU 0135 en-4118
35
2.2 Installation of optional modules
Modules must not be inserted or removed unless the device is free of voltage. The slots may only be
used for the intended modules.
2.2.1 Option locations on the device
Figure 5: Option locations
1
View from left
2
View from right
The various installation locations for the optional modules are displayed in the above-mentioned
drawings. Option location 1 is used to install an internal bus module or an internal power supply.
External bus modules or 24 V DC power supplies can be implemented at option location 3L or 3R.
Option locations 4 and 5 are used to install M12 sockets or connectors or for cable glands. Only one
option can be attached in an option location, of course.
Option
location
Position
Meaning
Size
Comments
1
Internal
Mounting location for customer units SK CU4-
…
3*
on side
Mounting location for
• external technology unit SK TU4-…
• power connector
3 A/B*
on side
Cable gland
M25
Not available if location 3
is occupied or SK TU4-…
is fitted.
4*
5*
on side
Cable gland
M16
Not available if SK TU4-…
is fitted.
* R and L (right and left side) – with engine mounting: Viewing direction from fan impeller to motor shaft
Содержание NORDAC START Series
Страница 1: ...BU 0135 en NORDAC START SK 135E SK 175E Users Manual for Motor Starters...
Страница 4: ...NORDAC START SK 135E SK 175E Users Manual for Motor Starters 4 BU 0135 en 4118...
Страница 111: ...8 Additional information BU 0135 en 4118 111 8 1 4 EU Declaration of Conformity...
Страница 119: ...Key word index BU 0135 en 4118 119...
Страница 120: ...6071302 4118...