PERCENTAGE %

5

10

15

20

25

30

40

45

50

55

TEMPERATURE °C

-2

-4

-6

-8

-11

-15

-19

-24

-30

-37

A1

A2

A3

1. 

Onto the “COLD WATER INLET” safety valve (10 bar) is screwed first, followed by 

a mini ball valve. The cold water pipe is then connected to the ball valve with an 

insulated plastic pipe 

(Image A1)

.

NOTE: 

The safety valve should have a drain pipe connected to its outlet. This 

pipe should run to ground level where hot water discharge is safe and clear of any 

paved areas. Do not seal or block the ends of this drain pipe or the valve outlet. 

Drinking water may be drained from this pipe during high irradiation situations.

2. 

The “HOT WATER OUTLET” is then connected to the hot water pipe of the con-

sumer network through an insulated plastic pipe (Plastic pipes are recommended 

to minimize electro-corrosion).

3. 

Filling the water storage tank WITH WATER: With the ball valve and a hot water 

tap open, the water storage tank is allowed to be filled with cold water. When 

water starts to run out of the tap, the water storage tank is full and the hot water 

tap can be closed.

4. 

At the solar water heater we place a thermostatic valve, regulated at 38°C to 

avoid hot water burns.

HYDRAULIC CONNECTION 

CONNECTING THE SYSTEM WITH THE COLD AND HOT WATER MAINS

The “COLD WATER INLET” and “HOT WATER OUTLET” sockets colored blue and red 

respectively are located on the side of the water storage tank.

ATTENTION! 

The connections to the hot and cold water pipes should be made with 

union nuts and not by soldering.

ATTENTION! 

 

Before starting to fill the closed loop with anti freeze liquid, the water storage tank has to be 

completely filled with water.

1. 

Connect the water mains to the specially designed filling fitting on the right of the water storage tank 

(Image A2)

 

& fill approx. half of the closed loop. Add water to the anti freeze liquid, putting double quantity of water in an 

empty pot. Disconnect the water mains from the filling fitting & empty the anti freeze liquid solution that we have 

prepared with the help of a funnel. Connect again the water mains and fill the closed loop completely. 

ATTENTION! 

The last filling phase should be realized with controlled flow, given that at the closed loop over

-

flow (safety valve connection point) the fluid may reach high temperatures, which may mean risk of 

 

skin burns.

2. 

When the closed loop is completely filled, securely tighten the  safety valve in position 

(Image A3)

 and discon-

nect the mains from the special filling fitting.

3. 

Uncover the collectors and clean the glass removing all the information stickers.

4. 

Check for leaks and make sure that all pipe joints to the collectors and the water storage tank, as well as the 

cold & hot water pipes towards the system are properly insulated, in order to avoid thermal loss and protect 

them against frost.

5. 

After the completion of the installation, no hot water should be consumed for a couple of hours (depending on 

the weather conditions and the solar irradiation), in order for the closed loop to be set in operation.

ANTI FREEZE LIQUID

 is an advanced, propylene glycol based special product, designed and formulated in order 

to ensure effective heat transfer properties at high or low temperatures. It is non-toxic and provides protection up 

to -37°C (solution 55% v/v with water). It is especially designed to provide excellent anticorrosion properties. In 

aquacius solutions anti freeze liquid offers protection according to the extent of dilution as per in the table below:

CLOSED LOOP FILLING

Solar water heaters

31

30

Solar water heaters - AELIOS

Solar water heaters - AELIOS

Содержание aelios

Страница 1: ...Solar water heaters Technical Manual Installation maintenance use instructions...

Страница 2: ...2 Solar water heaters AELIOS...

Страница 3: ...m2 LAYOUT 18 AELIOS 300lt 4m2 LAYOUT 19 AELIOS 300lt 6m2 LAYOUT 20 GENERAL INSTALLATION RULES 21 INSTALLATION POSITION 22 GENERAL PREVENTION MEASURES 23 SUPPORT BASE PARTS 24 SUPPORT BASE ASSEMBLY ON...

Страница 4: ...duce hot water during the daylight hours maintaining thus its maximum efficiency SOLAR WATER HEATER OPERATION WATER HEATING The collecting surface absorbs solar energy and heats the liquid water or a...

Страница 5: ...with low sunlight they achieve the preheating of the water which contributes to a drastically reduced consumption of conventional energy With the use of solar systems thermosiphonic or forced circulat...

Страница 6: ...DN16 1 PC SAFETY VALVE 1 5 bar for 250lt and above or 2 5 bar up to 200lt 1 PC SAFETY VALVE 1 5 bar for 250lt and above or 2 5 bar up to 200lt 1 PC INSULATION 22 X 9 2 PCS INOX TUBE DN16 2 PCS INOX TU...

Страница 7: ...ure Permissible operating pressure of the collector heat transfer medium XXX KPa Electrical Power XXX W Storage Tank S N Date of manufacture Solar water heater AELIOS xxxlt xm2 Type Flatplate collecto...

Страница 8: ...rotecting it against electrolysis and corrosion specially made to withstand the generally accepted specifications with regard to the heat resistance 8 Heating element rated according to the country of...

Страница 9: ...rption 4 Complete area absorber made of black painted aluminium 0 3mm thick or selective aluminium 0 4mm thick covers the complete window area as well as the headers thus increasing the collector s ab...

Страница 10: ...e increases heat loss Complete area technology The uniform area prevents heat loss FLAT SURFACE INCLINED SURFACE Supporting base system made of galvanised steel for installation on flat or inclined su...

Страница 11: ...5 2 90 2 84 2 NO Part Name DIM mm QTY 1 Beam L Laminate section 60 x 2 5mm 2060 x 60 2 2 Beam L Laminate section 60 x 2 5mm 1224 x 60 2 3 Beam L Laminate section 60 x 2 5mm 2289 x 60 2 4 Beam L Lamin...

Страница 12: ...1 Beam L Laminate section 60 x 2 5mm 2060 x 60 2 2 Beam L Laminate section 60 x 2 5mm 2289 x 60 2 3 Beam L Laminate section 60 x 2 5mm 925 x 60 2 4 Beam L Laminate section 33 x 2mm 980 2 5 Beam Lamin...

Страница 13: ...Laminate section 60 x 2 5mm 2060 x 60 2 2 Beam L Laminate section 60 x 2 5mm 2289 x 60 2 3 Beam L Laminate section 60 x 2 5mm 925 x 60 2 4 Beam L Laminate section 33 x 2mm 980 2 5 Beam Laminate sectio...

Страница 14: ...er 8 12 WATER STORAGE TANK 160lt DIMENSIONS mm 580x1116 WEIGHT EMPTY kg without packaging 66 8 JACKET CAPACITY lt 9 JACKET SURFACE m2 0 91 MAX TEST PRESSURE bar 15 MAX OPERATING PRESSURE bar 10 TOTAL...

Страница 15: ...ORAGE TANK 200lt DIMENSIONS mm 580x1356 WEIGHT EMPTY kg without packaging 81 8 JACKET CAPACITY lt 13 JACKET SURFACE m2 1 28 MAX TEST PRESSURE bar 15 MAX OPERATING PRESSURE bar 10 TOTAL SYSTEM AELIOS 2...

Страница 16: ...Y 1 Beam L Laminate section 60 x 2 5mm 2060 x 60 2 2 Beam L Laminate section 60 x 2 5mm 1224 x 60 2 3 Beam L Laminate section 60 x 2 5mm 2289 x 60 2 4 Beam L Laminate section 60 x 2 5mm 925 x 60 2 5 B...

Страница 17: ...2 WATER STORAGE TANK 200lt DIMENSIONS mm 580x1356 WEIGHT EMPTY kg without packaging 81 8 JACKET CAPACITY lt 13 JACKET SURFACE m2 1 28 MAX TEST PRESSURE bar 15 MAX OPERATING PRESSURE bar 10 TOTAL SYSTE...

Страница 18: ...8 12 WATER STORAGE TANK 200lt DIMENSIONS mm 580x1356 WEIGHT EMPTY kg without packaging 81 8 JACKET CAPACITY lt 13 JACKET SURFACE m2 1 28 MAX TEST PRESSURE bar 15 MAX OPERATING PRESSURE bar 10 TOTAL SY...

Страница 19: ...r 8 12 WATER STORAGE TANK 300lt DIMENSIONS mm 580x1970 WEIGHT EMPTY kg without packaging 114 5 JACKET CAPACITY lt 19 JACKET SURFACE m2 1 79 MAX TEST PRESSURE bar 15 MAX OPERATING PRESSURE bar 10 TOTAL...

Страница 20: ...TANK 300lt DIMENSIONS mm 580x1970 WEIGHT EMPTY kg without packaging 114 5 JACKET CAPACITY lt 19 JACKET SURFACE m2 1 79 MAX TEST PRESSURE bar 15 MAX OPERATING PRESSURE bar 10 TOTAL SYSTEM AELIOS 300lt...

Страница 21: ...specific conditions that apply As the sun ray s angle of attack varies with time but also depend ing on the system s location the collector s angle should be approximately equal to the installation lo...

Страница 22: ...e clean tidy The warranty should be filled in and the customer should sign it and immediately mail it to the company The customer should fill in the check list provided by the company The company does...

Страница 23: ...by trained specialized electro technicians only Labour uniforms Have protection glasses on as well as appropriate work uniform protection shoes protection helmet and special long hair net Do not wear...

Страница 24: ...4 5 6 0 10 32 350 6 142 7 790 4 582 5 901 923 933 3 0 13 107 5 147 5 223 5 1547 1560 1 2 0 10 715 725 4 60 11 10 0 2047 2060 0 11 2 60 60 0 114 990 2277 66 60 0 792 1190 1224 92 0 490 60 0 10 110 SUPP...

Страница 25: ...ixing washers 8 without tightening the M8 screws with the nuts In case of one collector model you don t need to use part 5 The collector is going to be fixed with the 2 collectors fixing washers 8 as...

Страница 26: ...r and above screw reinforcing plate 10 to collector beam 2 and vertical beam 3 with bolts M8x16 and nuts Repeat for another side 7 In case of installation of a three collectors system we place the 2 e...

Страница 27: ...he other end to the top left socket of the collector using the 22xDN16 INOX corner fitting having firstly passed the tube through the insulation pipe 16 Place the piece with the filling valve to the s...

Страница 28: ...ace part 4 between the two shape parts constructed in the former step 1 in order for the frame to be formed Screw straight parts 6 which will be used for the mounting of the support base to the tiles...

Страница 29: ...bases of a 1 collector system installing them in the same way on the left and the right side of the existing support base On the three support bases we place the three collectos according to the follo...

Страница 30: ...13 Join the other end to the top left socket of the collector using the 22xDN16 INOX corner fitting having firstly passed the tube through the insulation pipe 14 Place the piece with the filling valve...

Страница 31: ...specially designed filling fitting on the right of the water storage tank Image A2 fill approx half of the closed loop Add water to the anti freeze liquid putting double quantity of water in an empty...

Страница 32: ...nection switch with a mini mum distance between contacts of at least 3mm The circuit breaker s rating must be suitable for the heating element in use Caution A safety relay against electrical shock is...

Страница 33: ...ed The maximum distance between the collector outlet and the water storage tank inlet must not exceed 3m The angle of the pipe joining these 2 points must not be less than 8 SYSTEM INSTALLATION ON A T...

Страница 34: ...itions into consideration 2 Avoid large hot water consumption during the night 3 Check if your needs in hot water have increased and cannot be covered by the system s capacity 4 Make sure your solar w...

Страница 35: ...res 5 Remove the electrical heating element by removing the M8 screws 6 Remove the old magnesium bar from the heating el ement s flange 7 Screw in the new magnesium 8 Replace the heating element with...

Страница 36: ...of the pipe insulation and cleaning of the glass If the collector s glass is broken it should be replaced immediately It is recommended that the glass is washed at an hour of low sunlight to avoid dam...

Страница 37: ...done according to the local regulations HYDRAULIC CONNECTIONS Are there any leaks in the closed circuit the connections or in the tube heat exchanger Are the safety valves installed properly Does a m...

Страница 38: ...NOTES 38 Solar water heaters AELIOS...

Страница 39: ...Solar water heaters 39 Solar water heaters AELIOS...

Страница 40: ...RY 48 Vitosha Blvd Elin Pelin 2100 Sofia Region Bulgaria Tel 359 2 4210232 email info nobel bg The company preserves the right to change all specifications of the products and their accessories withou...

Отзывы: