9 Personnel requirements
Installation, commissioning and maintenance shall be executed only by personnel meeting the
demands as follows:
• Expert personnel with relevant training and appropriate qualification
• Personnel authorised by the plant operator
Qualified personnel
within the context of this documentation or the safety notes on the product itself are per-
sons who are sufficiently familiar with installation, mounting, starting up and operation of the
product and who have the relevant qualifications for their work; for example:
I. Training, instruction or authorisation to activate/deactivate, isolate, ground, and mark
electric circuits and devices/systems according to the safety engineering standards.
II. Education and instruction according to the standards of safety engineering regarding the
maintenance and use of adequate safety equipment.
III. First aid training
Содержание NivuFlow 650
Страница 39: ...Installation and Connection page 39 NF 650 rev 01 29 06 2020 Fig 21 4 Terminal connections NivuFlow 650 Type T4...
Страница 41: ...Installation and Connection page 41 NF 650 rev 01 29 06 2020 Fig 21 6 Terminal connections NivuFlow 650 Type TZ...
Страница 173: ...Approvals and Certificates Page 173 NF 650 rev 01 29 06 2020 Approvals and Certificates...