21
G
Operation.
3.3 Pressure build up
-
opening pressure / close gun (Core 125 and Core 130)
3.4 Motor stop –
Standby pressure (Core 125 and Core 130)
Outlet
Inlet
100
-
130 BAR
3 BAR
100
-
130 BAR
Gun close. Pressure build up. Opening pressure. Micro switch is
activated
Non return valve
Pump
Outlet
Inlet
16 BAR
3 BAR
16 BAR
Gun close. Motor stops. Pressure in hose decreases to standby pressure.
Pump pressure is also standby pressure.
Non return valve
Pump
Содержание Core 125
Страница 1: ...Repair Manual ver 1 0 Core 125 Core 130 ...
Страница 5: ...5 C Construction Core 125 Core 130 Construction of cabinet parts ...
Страница 6: ...6 C Construction Core 125 Core 130 Construction of pump unit ...
Страница 17: ...17 E Torque Pump torque Core 125 Core 130 8 Nm 11 Nm 17 Nm 18 Nm ...
Страница 18: ...18 E Torque Cabinet screw torque Core 125 Core 130 0 8 Nm 0 45 Nm 0 45 Nm ...
Страница 24: ...24 Wiring Diagram H Wiring and Circuit Diagram Core 125 only ...
Страница 25: ...25 Wiring Diagram H Wiring and Circuit Diagram Core 130 and Core 140 only Rød Red Rot Rouge ...