EN
English –
7
connect device, and disconnecting any buffer batteries, ensure that all leds
on the control unit are off and that the pole remains stationary when any
commands are sent. Check efficiency of the locking device to prevent inad-
vertent and/or unauthorised reconnection .
5.2 - Commissioning
Commissioning can only be performed after positive results of all test
phases. Partial or “makeshift” commissioning is strictly prohibited.
1
Compile and provide the automation owner with the “
CE Declaration of
conformity - Appendix I
”, at the end of this manual, in the removable sec-
tion .
2
Compile and provide the automation owner with the form “
Operation
Manual
” at the end of this manual, in the removable section .
3
Compile the form “
Maintenance schedule
” containing all maintenance
instructions for all devices in the automation and forward it to the owner .
In the case of S4BAR, this form is present at the end of this manual, in the
removable section .
4
Before commissioning the automation, ensure that the owner is adequately
informed of all associated risks and hazards .
5
Permanently affix on the pole the label in the pack regarding the gearmotor
manual release and locking operations .
6
ONLY for installations NOT IN CONFORMITY with the criteria stated in
chapter 1 .3 .1 of this manual: produce the technical documentation of
the automation, which must include the following documents: an overall
drawing of the automation, the wiring diagram of all connections made, an
assessment of all risks present and relative solutions adopted (see forms to
be compiled on the website
www.niceforyou.com
), declarations of con-
formity of manufacturer of all devices used (for S4BAR see appendix II) and
the declaration of conformity compiled by the installer .
Affix a dataplate on the barrier, specifying at least the following data: type of
automation, name and address of manufacturer (responsible for commis-
sioning), serial number, year of construction and CE mark .
These are the most important phases of automation set-up for ensuring maxi-
mum system safety . The test can also be performed as a periodic check of
automation devices . Testing and commissioning of the automation must be
performed by skilled and qualified personnel, who are responsible for the tests
required to verify the solutions adopted according to the risks present, and for
ensuring observance of all legal provisions, standards and regulations, and in
particular all requirements of the standard EN 12445, which establishes the test
methods for checking automations for doors and barriers . All these operations
must be performed under the direct supervision of the head installer, i .e . the
person who enters his/her name and signature in box N°1 of the declaration of
conformity (see appendix I).
The additional or optional devices must undergo a specific test for functionality
and correct interaction with S4BAR .
5.1 - Testing
The sequence of operations to be performed for testing refers to a standard
system (
fig. 1
) classed for “untrained users” and the automation activation
set to “automatic control” which envisages, as a minimum protection level of
the primary edge, device types C (force limitation - see standard EN 12445)
combined with device types D (presence detectors, e .g . photocells) . Bearing
in mind that this type of use is among the most intensive, the same testing
sequence can be effectively implemented in less intensive conditions .
1
Ensure that all specifications in this manual have been observed, with spe-
cial reference to the chapter “1 Safety Instructions” .
2
Check correct balancing of the pole, see paragraph 3 .8 .
3
Check correct operation of the manual release, see paragraph 3 .6 .
4
Using the transmitter or key-operated selector switch, perform tests of
opening, closing and stopping the barrier, and ensure that pole movement
corresponds to specifications. Test several times to check for pole move-
ment and any defects in assembly or adjustment and any possible points of
friction .
5
Check operation of all system safety devices one at a time (photocells, sen-
sitive edges, etc .) . Each time a device is activated the “Bluebus” LED on
the control unit must flash rapidly twice to confirm acknowledgement of the
event .
6
Check correct operation of the photocells as follows: depending on wheth-
er one or two pairs of photocells have been installed, one or two parallelepi-
peds in rigid material are required (e .g . wooden panels) with the measure-
ments 70 x 30 x 20 cm. Each parallelepiped must have three sides, one for
each size, in reflective material (e.g. mirror or white gloss paint) and three
sides in opaque material (e .g . black matt paint) . To test the photocells posi-
tioned at 50 cm from the ground, the parallelepiped must be placed on the
ground or raised at 50 cm in the case of photocells placed at 1 m from the
ground .
When testing one pair of photocells, the test specimen must be positioned
exactly at the centre of the pole with the 20 cm sides facing the photocells
and moved along the entire length of the pole (
fig. 39
) .
When testing two pairs of photocells, the test must first be performed
individually for each pair of photocells, using one test specimen, and then
repeated using two test specimens .
Each test specimen must be positioned laterally with respect to the centre
of the pole, at a distance of 15 cm sides and then moved along the entire
length of the pole (
fig. 40
) .
During these tests, the test specimen must be read by the photocells in any
position along the entire length of the pole .
7
Ensure there is no interference between the photocells and other devices,
by intercepting the optic axis joining the two photocells by means of a cyl-
inder (diameter 5 cm, length 30 cm,
fig. 41
): pass the cylinder first close to
the TX photocell, then close to the RX and lastly at the centre between the
two .
Ensure that in all cases the device engages, changing from the active
status to alarm status and vice versa, and that the envisaged action is gen-
erated in the control unit (for example movement inversion in the Closing
manoeuvre) .
8 Check protection against the risk of lifting:
on automations with verti-
cal movement, it must be ensured that there is no risk of lifting . This test can
be performed as follows: hang a weight of 20 kg mid-way along the pole
(for example, a sack of gravel), activate an Opening manoeuvre and ensure
that during operation the pole does not exceed the height of 50 cm from
the closing position. If the pole exceeds this height, reduce the motor force
(see chapter 6 - Table 7) .
9
If hazardous situations generated by the moving poles are protected by
means of impact force limitation, measure the force as specified in the
standard EN 12445. If motor force control is used as auxiliary function with
the system for reduction of impact force, test and identify the setting that
obtains the best results .
10 Check efficiency of the release system:
place the pole in the Closing
position and manually release the gearmotor (see paragraph 3 .6) ensuring
that there is no difficulty with this procedure. Ensure that the manual force
required to move the pole on opening is no greater than 200 N (approx. 20
kg); the force is measured perpendicular to the pole and at 1 m from the
rotation axis. Lastly, ensure that the key required for manual release is avail-
able in the vicinity of the automation .
11 Power supply disconnection system check:
by using the power dis-
TESTING AND COMMISSIONING
5
Содержание S4BAR
Страница 2: ......
Страница 20: ......
Страница 40: ......
Страница 60: ......
Страница 80: ......
Страница 100: ......
Страница 120: ......
Страница 140: ......
Страница 143: ...I I 1 A B C B 330 mm 2 179 5 mm 1146 mm 826 mm 4000 mm 3 b a d e f g h c...
Страница 144: ...II II 5 A B C 1 2 4...
Страница 145: ...III III 9 10 90 6 A C B 7 8 B A...
Страница 146: ...IV IV 14 A B 15 A B 11 A B 12 13 A B...
Страница 147: ...V V 16 A B 17 18...
Страница 148: ...VI VI 20 180 21 C C A B 1cm 1cm 19 A C B...
Страница 149: ...VII VII 22 23 26 L N 24 1 2 25...
Страница 151: ...IX 30 A A B STOP 31 A B...
Страница 152: ...X 32 A B C D STOP 33 A B 34...
Страница 153: ...XI 35 36 L7 L8 37 A B L7 L8 2 1 L8 L7 L8 L8 L7 L8 A B C Op L5 L6 L7 L8 Stop Set Close F u s e 1 A T 38...
Страница 154: ...XII 300 200 700 500 39 300 200 700 500 150 40 41...
Страница 155: ...a c d e b F2 F1 42 43 XIII...
Страница 156: ...XIV 44 O pe n L1 L2 L3 L4 L5 L6 L7 L8 St op Se t Cl os e Fuse 1AT 45 f g...
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ...IST S4BARR02 4865_14 02 2017 www niceforyou com Nice S p A Via Pezza Alta 13 31046 Oderzo TV Italy info niceforyou com...