Commissioning and
adjusting
FILLING AND VENTING
Filling the hot water heater
1.
Open a hot water tap in the house.
2.
Fill the hot water heater through the cold water
connection (XL3).
3.
When the water that comes out of the hot water
tap is no longer mixed with air, the water heater is
full and the tap can be closed.
Filling and venting the charge coil
Filling
1.
Open the externally mounted filling valve. Fill the
coil in the hot water heater and the rest of the cli-
mate system with water.
2.
Open the vent valve (QM22).
3.
When the water that exits the vent valve (QM22) is
not mixed with air, close the valve. After a while,
the pressure starts to rise.
4.
Close the filling valve when the correct pressure is
obtained.
Venting
1.
Vent the coil via the vent valve (QM22) and the rest
of the climate system via the relevant vent valves.
2.
Keep topping up and venting until all air has been
removed and the pressure is correct.
The figure shows VPB S200.
XL3
QM22
START-UP AND INSPECTION
Pressure drop diagram, charge coil
Docking connection, supply line (XL8) and docking con-
nection, return line (XL9).
VPB S200
0
0
0,05
0,1
0,15
0,2
0,25
0,3
0,35
0,4
0,45
5
10
15
20
25
30
35
Tryckfall
(kPa)
Flöde
(l/s)
0,5
40
50
45
Pressure drop
(kPa )
Flow
(l/s)
Enamel
Copper
Stainless
VPB S300 / VPBS S300
Flöde
(l/s)
Tryckfall
(kPa)
0
0,05
0,1
0,15
0,2
0,25
0,3
0,35
0,4
0,45
0,5
0
5
10
15
20
25
30
35
40
50
45
Pressure drop
(kPa )
Flow
(l/s)
Enamel
Stainless
Copper
Pressure drop diagram, solar coil
Connection, supply line solar heating system (XL13) and
connection, return line solar heating system (XL14).
VPBS S300
0
0
0,02 0,04 0,06 0,08
0,1
0,12 0,14 0,16 0,18
1,0
2,0
3,0
4,0
5,0
Tryckfall
(kPa)
Flöde
(l/s)
0,2
Pressure drop
(kPa )
Flow
(l/s)
Enamel
Copper
NIBE VPB S/ VPBS S
Chapter 3 | For the Installer
16
Содержание VPB S Series
Страница 1: ...CHB EN 2126 2 531224 USER AND INSTALLER MANUAL Water heater Accumulator tank NIBE VPB S VPBS S...
Страница 2: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......