Lift from the street to the set up location
If the base allows, the simplest thing is to use a pallet
truck to move the F2030 to the set up location.
NOTE
The centre of gravity is offset to one side (see
print on the packaging).
LEK
If F2030 must be transported across soft ground, for
example a lawn, we recommend that a crane that can
lift it to the set up location is used. When the F2030 is
lifted by crane the packaging must be untouched and
the load equally distributed with a boom, as illustrated
above.
If a crane cannot be used F2030 can be transported
using an extended sack truck. F2030 must be used on
the side marked "heavy side" and two people are re-
quired to get the F2030 up.
Lift from the pallet to final positioning
Before lifting remove the packaging and the securing
strap to the pallet.
Place lifting straps around each machine foot. Lifting
from the pallet to the base requires four persons, one
for each lifting strap.
It is not permitted to lift anything other than the ma-
chine feet.
Scrapping
When scrapping, the product is removed in reverse
order. Lift by the bottom panel instead of a pallet!
Condensation water trough
The condensation water trough is used to collect and
lead away condensation water from the heat pump.
NOTE
It is important to the heat pump function that
condensation water is led away and that the
drain for the condensation water run off is not
positioned so that it can cause damage to the
house.
NOTE
Pipe with heating cable for draining the con-
densation water trough is not included.
NOTE
To ensure this function the accessory KVR 10
should be used.
NOTE
The electrical installation and wiring must be
carried out under the supervision of an author-
ised electrician.
Caution
If none of the recommended alternatives is
used good lead off of condensation water
must be assured.
■
The condensation water (up to 50 litres/day) collec-
ted in the trough should be routed by pipe to an
appropriate drain, it is recommended that the
shortest outdoor stretch possible is used.
■
The section of the pipe that can be affected by frost
must be heated by the heating cable to prevent
freezing.
■
Route the pipe downward from F2030.
■
The outlet of the condensation water pipe must be
at a depth that is frost free or alternatively indoors
(with reservation for local ordinances and regula-
tions).
■
Use a water trap for installations where air circulation
may occur in the condensation water pipe.
■
The insulation must be tight against the bottom of
the condensation water trough.
NIBE™ F2030
Chapter 2 |
Delivery and handling
8
Содержание F2030
Страница 1: ...Installer manual LEK NIBE F2030 Air water heat pump IHB GB 1540 4 231115...
Страница 2: ......
Страница 13: ...Removing the side cover LEK APH 11 Chapter 2 Delivery and handling NIBE F2030...
Страница 32: ...5 The temperature on the flow temperature sensor falls below 4 C NIBE F2030 Chapter 7 Control Introduction 30...
Страница 48: ...Electrical circuit diagram NIBE F2030 Chapter 11 Technical data 46...
Страница 49: ...47 Chapter 11 Technical data NIBE F2030...
Страница 50: ...NIBE F2030 Chapter 11 Technical data 48...
Страница 51: ...49 Chapter 11 Technical data NIBE F2030...
Страница 54: ......