40
NIBE BA-SVM 10-200
9 Control
Section 9 |
Control
Menu 1 - INDOOR CLIMATE
1-INDOOR CLIMATE
1.1 temperature
1.1.1 - heating
1.1.2 - cooling
1.2 - ventilation
1
1.3 - scheduling
1.3.1 - heating
1.3.2 - cooling
1.3.3 - ventilation
1
1.9 - advanced
1.9.1 - curve
1.9.1.1 - heating curve
1.9.1.2 - cooling curve
1.9.2 - external adjustment
1.9.3 - min. flow line temp.
1.9.3.1 - heating
1.9.3.2 - cooling
1.9.4 - room sensor settings
1.9.5 - cooling settings
1.9.6 - fan return time
1
1.9.7 - own curve
1.9.7.1 - heating
1.9.7.2 - cooling
1.9.8 - point offset
1
The ERS additional equipment is necessary.
Содержание BA-SVM 10-200 Series
Страница 2: ......
Страница 86: ...86 NIBE BA SVM 10 200 ...
Страница 87: ......
Страница 88: ...NIBE Group Hannabadsvägen 5 285 32 Markaryd Sweden www nibe eu ...