
Load Management
Overview
Load Shed Energy Management is selected from the main
AC Power
screen.
Load Management Screen
The
Load Management
screen displays the Power Phase setting and Service Capacity.
The current amp draw is displayed for both Power Legs on this screen.
From this screen the user also selects the
Load Status
screen by tapping the "Loads" button. You may also access the
Settings
screen by tapping the "Settings" button.
SilverLeaf > AC Power > Load Management Screen
© 2014 Copyright Newmar Corporation. All rights reserved.
p.14
Содержание King Aire 2015
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 24: ...Spartan Lightbar Message Center 2015 Newmar King Aire Diesel Bus 22...
Страница 25: ...System Initialization Sequence 2015 Newmar King Aire Diesel Bus 23...
Страница 26: ...Telltale Warning Light Information 2015 Newmar King Aire Diesel Bus 24...
Страница 46: ...2015 Newmar King Aire Diesel Bus 44...
Страница 91: ...Article about RV C the RV industry standard protocol 2014 Copyright Newmar Corporation All rights reserved p 6...
Страница 146: ...SilverLeaf Floor Heat screen 2 2014 Copyright Newmar Corporation All rights reserved p 61...
Страница 162: ...SilverLeaf Advanced screen 2014 Copyright Newmar Corporation All rights reserved p 77...
Страница 171: ...SilverLeaf Features 3 Floor Heat Configuration screen 2 2014 Copyright Newmar Corporation All rights reserved p 86...
Страница 173: ...SilverLeaf Features 3 Warnings Configuration screen 2 2014 Copyright Newmar Corporation All rights reserved p 88...
Страница 175: ...SilverLeaf Advanced screen 2014 Copyright Newmar Corporation All rights reserved p 90...
Страница 181: ...SilverLeaf Features 4 Component Versions screen 2 2014 Copyright Newmar Corporation All rights reserved p 96...