INSTALLATION, OPERATING
and
SERVICE MANUAL
NEWMAC ADD-ON WOOD FURNACE
MODEL WAO E
All installations must be made in accordance with local and
provincial or state codes which may differ from the manual.
HEAD OFFICE
MARKETING / PRODUCTION
Newmac Mfg. Inc.
DEBERT AIR INDUSTRIAL PARK,
208 LANCASTER CRESCENT
P.O. BOX 9, DEBERT
NOVA SCOTIA, BOM 1G0
PHONE: 902-662-3840
FAX: 902-662-2581
:
WAREHOUSE
Newmac Mfg. Inc.
430 SPRINGBANK AVE., SOUTH
WOODSTOCK, ONTARIO
N4V 1B2
PHONE: 519-539-6147
FAX: 519-539-0048
WEB SITE
: newmacfurnaces.com
NOTICE TO HOMEOWNER:
READ THESE INSTRUCTIONS
SAVE THESE INSTRUCTIONS
2210367 June 2012
Subject to change without notice
Printed
:
CSA B415.1
156156
Содержание WAO E
Страница 7: ...6 FIG 2 CONTROL LOCATIONS...
Страница 13: ...12 FIG 4 OVERALL DIMENSIONS...
Страница 14: ...13 FIG 5 OPTIONAL BLOWER SECTION OVERALL DIMENSIONS FIG 6 PRIMARY COMBUSTION AIR FLOW...
Страница 16: ...15 FIG 8 INLINE DUCT CONNECTION...
Страница 17: ...16 FIG 9 FLOW OF GASES...
Страница 23: ...22 22 FIG 10 WIRING DIAGRAM BELT DRIVE...
Страница 24: ...23 23 FIG 11 WIRING DIAGRAM DIRECT DRIVE...
Страница 25: ...24 24 FIG 12 WIRING DIAGRAM VSM...
Страница 26: ...25 25 FIG 13 WIRING DIAGRAM OPTIONAL BLOWER SECTION...
Страница 29: ...28 28 FIG 16 AUXILLARY BAFFLES REMOVAL RE INSTALLATION...
Страница 30: ...29 29 FIG 17 SECONDARY AIR SYSTEM BAFFLES REMOVAL INSTALLATION...